Published October 26, 2022 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a civil project in Athens, Tennessee. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Division 1: Construction of a new cast-in-place 1,850 gpm submersible sewer pump station and modifications to an existing 1,300 gpm wet-pit/dry-pit sewer pump station, flow measurement, automated valving, sump pumps, instrumentation and controls, ATS, emergency generator, and miscellaneous site work. Division 2: Extension of and existing force main to the WWTP by Installing 5,827 ft of 14" HDPE pipe. Includes valving and 138 ft of directional drill creek crossing, 80 ft of bore and jack, testing, clean-up, and seeding The Projects have an expected duration of: Division 1: 540 days. Division 2: 300 days. For further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Information for Bidders that are included in the CONTRACT DOCUMENTS. The Owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, a 5% Bid Bond, in the form and subject to the conditions provided in the Information for Bidders. All bidders must be licensed General Contractors as required by the Contractor's Licensing Act of 1994, as amended, of the General Assembly of the State of Tennessee, and qualified for the type of construction being bid upon. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. This project is being funded by local funds, a Community Development Block Grant, a State Revolving Fund loan, along with the US Department of Commerce Economic Development Administration providing partial funding for this project (EDA Investment No. 04-79-07755). Therefore, the work is subject to the Federal and State laws and regulations associated with the listed programs. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. DAVIS-BACON ACT and AMERICAN IRON AND STEEL REQUIREMENTS The successful bidder must be in compliance with all applicable Davis-Bacon Act and American Iron and Steel requirements DISADVANTAGED BUSINESS ENTERPRISES (DBE) REQUIREMENTS Bidders must comply with the SRF Loan Program's Disadvantaged Business Enterprises (DBE) requirements including contacting a minimum of 10 qualified DBE sub-contractors, professional service providers, vendors, and/or suppliers by certified mail to solicit bids. The apparent successful Bidder must submit to the Owner copies of the certified letters and return receipts prior to contract award. Neither the State of Tennessee nor any of its departments, agencies, or employees is or will be a party to this Advertisement for Bids or any resulting contract(s) awarded by the Owner. SPECIAL NOTICE TO DISADVANTAGED BUSINESS ENTERPRISES (DBE) FIRMS All qualified Disadvantaged Business Enterprises (DBE) firms desiring to bid as a General Contractor, subcontractor, professional service provider, supplier, or equipment vendor are encouraged to contact Ms. Marilyn Robinson at the Nashville Minority Business Center office listed above to review bidding/contract documents. Qualified Disadvantaged Business Enterprises (DBE) firms may also contact the owner's bidding contact in order to obtain a list of prospective bidding General Contractors or to obtain copies of bidding/contract documents. Athens Utilities Board does not discriminate based on race, color or national origin in federal or state sponsored programs, pursuant to Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d). AUB Boards award (SRF req) Oct 25, 2022 Authority to Award (ATA) to SRF/EDA Nov 8, 2022 Athens City Council award resolution (CDBG req) Nov 15, 2022 SRF/CDBG/EDA Award Concurrence Dec 9, 2022 30 days from submission Pre - Construction Conference Jan 10, 2023 Notice to Proceed (Div 1 and Div 2) Feb 6, 2023 Division 2 Completion (300 days) Dec 8, 2023 300 calendar days Division 1 Completion (540 days) Aug 9, 2024 540 calendar days Close-out Sept 9, 2024 30 calendar days The design of this project was completed by the owner's in-house design professional Bid Results Division 1: - Pump Stations to W&O Construction - $2805000 Division 2: - Force Main to Morgan Contracting - $1816383

Bid Results

Water / Sewer

$4,621,383.00

Public - City

New Construction, Site Work

35

27

4

6

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Shop-Fabricated Structural Wood, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Flooring, Resilient Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Other Specialties, Pest Control Devices
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Specialty Casework, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Facility Sanitary Sewerage, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Transfer Switches, Automatic Transfer Switches
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Vibroflotation and Densification, Densification, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Monorails, Monorail Track, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
53
Bidding Soon
557
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2022

February 6, 2023

img_map_placeholder

Multiple Locations, Athens, TN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2020 - Athens Sewer System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.