BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Syracuse, New York. Contact the soliciting agency for additional information.

The New York State Department of Transportation is assisting JMT of NY, in the selection and retention of a Subcontractor, to provide Work Zone Traffic Control for Consultant and State Inspection Teams throughout NYSDOT's Region 3, under Contract No. D038193, PIN 3B22.02 The selected Subcontractor will be required to provide all labor, materials, machinery, tools, and equipment for the Work Zone Traffic Control for the 2022-2023 Biennial & Interim Bridge Inspection, NYSDOT Region 3, Cayuga, Cortland, Onondaga, Oswego, Seneca and Tompkins Counties in the State of New York. The required traffic control will assist JMT of NY and New York State Department of Transportation (NYSDOT) personnel, or their authorized designee, with the inspection of said bridges. Work shall be performed as described and in accordance with the Manual of Uniform Traffic Control Devices. Required Experience: As the safety of human lives is at risk, the Subcontractor shall have had a minimum of five (5) years documented experience in the performance of traffic control. Additionally, all flag persons shall have had a minimum of six (6) months of documented experience in traffic control. All Subcontractors' personnel assigned to this work shall have current flagger certification necessary to perform the work, must be able to communicate in a clear and effective manner and be familiar with the MUTCD manual. Interested parties may receive a BID package from: Mr. Charles Kincaid, (ckincaid@jmt.com) which explains in more detail the nature of the work, requirements and conditions needed to successfully complete this assignment. Contract: January 1, 2022, until May 31, 2026. The project period is from June 2022 until May 31, 2024. The majority of the work will be performed from June 2022 through December 2023 with minimal or uncertain amount of work anticipated in 2024. The number of workdays required per crew to provide Work Zone Traffic Control per week will vary from zero to five (0 to 5) days. As many as two (2) to three (3) separate work crews with all necessary equipment and materials may be required to work simultaneously at any time during the Contract. Also, full and partial day and nighttime closures will be required to complete the work. One contract will be awarded for both day and night work. JMT of NY has a prime contract with the NYSDOT, Contract No. D038193. All applicable provisions of the prime contract apply to the subcontract. JMT of NY reserves the right to reject any and all bids, to waive any and all informalities, to invite for new bid proposals and to disregard all nonconforming, non-responsive or conditional bids.

Post-Bid

Bridges / Tunnels

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
86
Bidding Soon
1,462
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

June 27, 2022

Project location map

Multiple Locations, Syracuse, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.