BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a bridge / tunnel in Cottleville, Missouri. Completed plans call for site work for a bridge / tunnel.

The Scope of Work for the Project includes but is not limited to temporary access to existing treatment plant and private residences, removal of existing box culvert, new box culvert, new wing walls, site grading, access road construction, and all civil, site and ancillary work as necessary for a complete and satisfactory project as shown on the Drawings and specified herein. Direct all questions to Dan Woodcock at dwoodcock@waterdistrict2.com

Post-Bid

Bridges / Tunnels

$200,000.00

Public - County

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
95
Bidding Soon
1,242
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

July 4, 2022

Project location map

To Be Determined, Cottleville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.