BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Moreno Valley, California. Contact the soliciting agency for additional information.

The County of Riverside Department of Waste Resources is seeking proposals from industry professionals qualified in providing geological, geotechnical and construction quality assurance/quality control services for an upcoming project referred to as "Phase 2, Stage 1 (P2S1) Liner Expansion Project, at the Badlands Sanitary Landfill" (Project). The Project will expand the size of the disposal area at the Badlands Sanitary Landfill (Site) by approximately 33 acres, in accordance with the requirements of Title 27 of the California Code of Regulations (CCR), and Subtitle D of the Code of Federal Regulations (CFR). Waste Resources engineering staff is responsible for coordinating all project tasks including the preparation of project designs and Contract Documents. Upon receiving and evaluating proposals, Waste Resources reserves the right to award Service A and B (together) and C as separate contracts to different Bidders, or as one contract to a single Bidder. To that end, each proposal must include Attachments A, B and C (enclosed), and must be completed so that the various services may be reviewed independently. The selected Bidder(s) for the required services will be tasked to provide one or more of the following services: Service A: Geotechnical Services Service A: The Bidder shall provide geotechnical services including, but not limited to static and seismic stability analysis for liner subgrade, the corresponding fill, and the proposed stockpiles. The Bidder may perform geotechnical research of previously conducted geotechnical investigations within the P2S1 Liner Expansion Area and, for the proposed stockpile locations, the Bidder may provide field and laboratory soil testing and soil borings. Geotechnical services shall also include a technical peer review of the contract documents for project construction. At the conclusion of performing all sub-tasks in Service A, the Bidder shall prepare and submit to Waste Resources for review and forwarding to the CRWQCB-SAR a comprehensive design report summarizing stability analysis results and recommendations on processing/placement procedures for the required engineered fill and any other aspect of construction that may be necessary for slope stability. This comprehensive design report must be prepared and signed by either a California Registered Civil Engineer or a California Registered Engineering Geologist. Estimated time frame for providing Service A is August to September 2022. Service B: Geological Services Service B: The Bidder shall provide geological services including, but not limited to: geologic observation and comprehensive mapping of all slope areas that have been exposed by the recent excavation operations within the P2S1 Project Area (currently called the Canyon 6 Borrow Area). At the conclusion of services, a final report summarizing Project geology, test results, geologic maps, cross-sections and recommendations must be prepared, signed, and submitted to Waste Resources by either a California Registered Civil Engineer or a California Registered Engineering Geologist. Estimated time frame for providing Service B is August to September 2022. Service C: Construction QA/QC Services Service C: For the construction phase of the Project, the Bidder shall provide a construction QA/QC Manager, technical staff, and construction QA/QC testing equipment and facilities with sufficient resources to keep pace with construction activity and verify conformance with the construction QA/QC plan (Refer to Attachment D - Sample QA/QC Plan). Upon completion of construction, a detailed construction QA/QC final report illustrating conformance with the project specifications must be prepared, signed, and submitted to Waste Resources by either a California Registered Civil Engineer or California Registered Engineering Geologist. Service C work will be performed during the project's construction phase. It is estimated that project construction will be initiated between February and April 2023. DEADLINE FOR SUBMISSION OF QUESTIONS is 5/20/2022 5:00pm PST Bid Contact Derek Price-Nolen (951) 486-3233 depnolen@rivco.org 14310 Frederick Street Moreno Valley, CA 92553 The Method of Contractor Selection has not been determined at this Time.

Conceptual

Municipal

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
96
Bidding Soon
2,142
All Active Projects
965
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2022

img_map_placeholder

31125 Ironwood Ave, Moreno Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.