BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Buena Vista, Colorado. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

This announcement constitutes a Pre-Solicitation Notice/Synopsis in accordance with FAR Subpart 5.2. The Government intends to issue a formal solicitation via a Request for Proposals (RFP) in accordance with FAR 15, following this announcement, on or about 15 days from the publication of this announcement. The solicitation and if applicable, any amendments, shall be posted on SAM.gov. Responses will be due 30 days after the solicitation is posted, unless extended through an amendment. There may be a question and answer period/pre-proposal conference before proposals are due. Interested offerors must be active in SAM.gov at the date and time proposals are due to be eligible for award. Proposals submitted by contractors without an active record in SAM.gov will not be considered. Note: This solicitation will be a re-solicitation of 1240LT22R0062. The U.S. Forest Service plans to solicit offers for a single award, Firm-Fixed Price contract type with an estimated magnitude for the base and options between $500,000 and $1,000,000. The Government anticipates awarding a sole contract for the replacement of a bridge at South Cottonwood Creek in San Isabel National Forest in Buena Vista, CO. Additional awards, at Forest Service discretion, may be considered depending on Forest Service need and results for proposal evaluations. Prospective offerors are required to submit proposals in accordance with the forthcoming solicitation. Scope of Work: The work shall consist of what is shown on the plans, stated in the specifications, and summarized below: Coordinate with the Upper Arkansas Water Conservancy District and the Cottonwood Lake Summer Group Homes to relocate their facilities as required. Construct the bypass. Close the road and relocate the existing bridge superstructure to the bypass. Install traffic control signing as required and move traffic to bypass. Remove the remainder of the existing bridge. Remove trees and clear and grub as required. Excavate for footings. Construct the footings. Construct the abutments and wingwalls. Backfill the abutments to just below the beam seat elevation. Grade portions of the channel banks under the new bridge. Install riprap adjacent to the new structure. Erect the steel girders. Construct the concrete deck and end diaphragms. Construct the utility conduits. Construct the remaining backfill and approach embankments. Install the bridge rails. Install the approach rails. Open the road new road and bridge to traffic. Obliterate the bypass and dispose of the bypass bridge. Complete the riprap installation along the stream. Prepare the finished grading and apply seeding. This opportunity is set aside for total small businesses. Location(s): The bridge carries NFSR 344 over South Cottonwood Creek adjacent to the outlet from Cottonwood Lake. The bridge is located approximately 9.5 miles southwest of Buena Vista, Colorado in the San Isabel National Forest. Disclaimer: This notice does not commit the Government to contract for any supply or service. Respondents are advised that the United States (U.S.) Government will not pay for any information or administrative cost incurred in response to this notice. All costs associated with responding to this notice will be solely at the responding party's expense. Please be advised that all submissions become Government property and will not be returned. Responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract. Submit questions and/or concerns to: Lonnie Root, Contracting Officer lonnie.root@usda.gov and Jose Gutierrez, Contract Specialist jose.gutierrez4@usda.gov The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Bridges / Tunnels

$1,000,000.00

Public - Federal

Demolition, New Construction, Paving, Site Work

21

6

11

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
25
Bidding Soon
580
All Active Projects
254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2023

img_map_placeholder

To Be Determined, Buena Vista, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.