BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Barstow, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of August 25th, 2022, project has not been awarded. Project is expected to be awarded sometime after September 7th. This construction project is located on North 1st Avenue in the City of Barstow. The City of Barstow (City), in cooperation with the California Department of Transportation (Caltrans) and the San Bernardino County Transportation Authority (SBCTA), is proposing to replace the existing two-lane North 1st Avenue bridge over the BNSF railyard with a new two-lane bridge including 8-foot shoulders and an 8-foot sidewalk. The southern terminus of the project would be just south of White Street and the northern terminus would be at Riverside Drive. The existing bridge would be demolished and removed. The North 1st Avenue Bridge Replacement Project (Project) consists of, but is not limited to, the following components: Construction of new 7-span post-tensioned concrete box girder bridge on seat type abutments and deep foundations. Removal of existing 29-span steel truss and steel / timber girder bridge across the BNSF railyard. Removal of existing building foundations. Construction of new 380-foot-long soil nail retaining wall. Realignment of North 1st Avenue approach roadway and intersections. Associated work includes utility relocation, drainage improvements, lighting improvements, pavement construction, curb ramps, sidewalks, and improvements to Del Taco parking lot. Liquidated Damages 13,500 Per Calendar Day of Delay Online Q&A Yes Q&A Deadline 06/10/2022 4:00 PM (PDT) "Base Bid" estimate for this project is approximately Forty Three Million, Three Hundred and Seven Thousand dollars ($43,680,000). Notice To Proceed: September 2022

Bid Results

Bridges / Tunnels

$30,725,220.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

108 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
68
Bidding Soon
1,273
All Active Projects
578
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2022

January 9, 2023

img_map_placeholder

N 1st Ave, Barstow, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.