BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in El Paso, Texas. Completed plans call for the renovation of a transportation facility.

Works to be provided for this project shall be for furnishing all labor, materials, transportation, and services for the construction and installation as follows: 1. Provision and installation of approximately 1,850 linear feet (lf) of new 24" ductile iron well collector pipeline and approximately 8,000 lf of new 30" ductile iron well collector pipeline. These segments of the project are referred to as "Corridor e" and will replace the existing well collector pipeline within these replacement limits. The exception is under the existing 8l-26r airport runway which was recently installed in 2014. The corridor e pipeline will tie-in to this newly installed pipeline on both ends of the runway. The proposed well collector pipeline routing will be offset from the existing well collector pipeline and the existing well collector pipeline will be abandoned in place. 2. Provision and installation of approximately 3,300 linear feet (lf) of new 36" ductile iron well collector pipeline. This segment of the project is referred to as "Corridor d" and will replace the existing well collector pipeline within these replacement limits. The exception is under the existing 8l-26r airport runway which was recently installed in 2014. The corridor d pipeline will tie-in to this newly installed pipeline on both ends of the runway. The proposed well collector pipeline routing will be offset from the existing well collector pipeline and the existing well collector pipeline will be abandoned in place. 3. The project includes installation of new intertie pipelines between existing pipelines and corridor e and corridor d in such a way that will simplify the valving configuration near the southernmost epia access road. The revised piping will allow epwater to easily deliver water from the various airport wells to either the existing mcrae reservoir or montana reservoir with valve manipulation. 4. Also included in the project is installation of three portions of the pipelines by means of trenchless methods with installation of the pipeline within fiberglass casings. The project description, as shown above, is only a general overview of this project. The contractor shall refer to the project plans and specifications for further information.

Post-Bid

Transportation Terminals

Public - City

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
7
Bidding Soon
248
All Active Projects
99
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2022

July 7, 2022

img_map_placeholder

6701 Convair Rd, El Paso, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.