Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a civil project in Sumner, Washington. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Est. Value Notes: Between $3,000,000 and $3,750,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Sewer Force Main, 285-00 Electrical Equipment & Supplies, Electrical and Controls, Trenchless Utility Construction, Water Transmission Pipelines, Construction, Aggregate, Concrete/Formed/Flatwork/Foundation, Electrical Installation/Construction, Fittings and Valves, Fencing/Guardrails/Handrails, Fire Hydrant, Grade and Surface, Pavement Removal, Excavation, Traffic Control/Flagging, Landscaping - Seeding, Erosion Control - Temporary, Paving (Asphalt or Concrete), Electrical, Lift Stations/Lift Station Equipment, Directional Bore, Directional Drilling, Sewer and Water Construction, Sitework/Excavating and Grading, Water and Wastewater Facilities, Water/Wastewater Infrastructure, Grubbing & Clearing, Waterlines. Description: Work consists of constructing a new pump station and installing approximately 1,910 linear feet of 8-inch diameter sewer force main and approximately 1,850 linear feet 16-inch potable water main using horizontal directional drilling technique. Other work elements consist of installing minor site grading and stormwater improvements for the pump station site; removal of miscellaneous items in conflict with the Work; and restoration. Portions of this work will be conducted with BNSF right of way which will require the Contractor to coordinate with BNSF for scheduling and to acquire the necessary training and permits/agreements.
Post-Bid
Water / Sewer
$3,750,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 7, 2022
August 8, 2022
24th St E, Sumner, WA
Related To This Project
Sumner, WA
Bid Date: Jun 22 2022
Sumner, WA
Bid Date: Sep 23 2021
Sumner, WA
Bid Date: Jan 06 2023
Sumner, WA
Bid Date: Jun 21 2022
Sumner, WA
--
Sumner, WA
Bid Date: Jul 08 2022
Sumner, WA
Bid Date: Jun 06 2022
Sumner, WA
Bid Date: Apr 18 2022
Sumner, WA
Bid Date: May 19 2022
Sumner, WA
--
Sumner, WA
Bid Date: Apr 14 2022
Sumner, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.