BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a civil project in Nordegg, Alberta. Completed plans call for site work for a bridge / tunnel.

DEMOLITION, BRIDGE CULVERT INSTALLATION AND OTHER WORK 11:04 B.F. 73489 - Carrying Hwy 11 over Gonika Creek, Southwest of Nordegg, kilometre 36.564 to 36.564 CENTRAL REGION APPROXIMATE QUANTITIES: 1 lump sum Demolition and Disposal of Existing Bridge Structure 67 metres 4 300 mm dia SPCSP 12 000 cubic metres Excavation - Structural 1000 cubic metres Excavation - Channel 1 900 cubic metres Backfill - Granular 1 000 cubic metres Backfill Non-granular 1 000 cubic metres Borrow Excavation Contractor Supplied 480 tonnes Granular Base Course 220 tonnes Asphalt Concrete Pavement Mix Type H2 (PG 58-28) Contractor to supply all materials.

Award

Bridges / Tunnels

$2,695,345.00

Public - State/Provincial

Site Work

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
10
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

June 27, 2022

Project location map

B.F. 73489 - Carrying Hwy 11 over Gonika Creek, Southwest of Nordegg, Nordegg, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.