Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 31, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Dora, Alabama. Completed plans call for site work for a water / sewer project.

Principal Work: 1). 800 LF DR9 8" HDPE Directional Bore 2). 2 - 8" Gate Valves 3). 2 - Water System Connections Each bidder must deposit, with its bid, security in the amount of, form of and subject to the conditions provided in the Information for Bidders. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract The owner reserves the right to waive any informalities or to reject any or all bids.

Bid Results

Water / Sewer

$300,600.00

Public - County

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
42
Bidding Soon
831
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2022

June 30, 2022

Project location map

Multiple Locations, Dora, AL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed