BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Westerville, Ohio. Completed plans call for the renovation of a educational facility.

Please direct all bidding RFIs to Murtadha Al Shaikhli at murtadha@triadarchitects.com. Bidders may submit requests for consideration of a proposed Substitution for a specified product, equipment, or service to the Architect/Engineer (A/E) no later than 10 days prior to the bid opening. Additional products, equipment, and services may be accepted as approved Substitutions only by written Addendum. From time to time, the Commission issues new editions of the "State of Ohio Standard Requirements for Public Facility Construction" and may issue interim changes. Bidders must submit Bids that comply with the version of the Standard Requirements included in the Contract Documents. Equal Employment Opportunity requirements are applicable to this Project. Bidders are encouraged to be enrolled in and to be in good standing in a Drug-Free Safety Program ("DFSP") approved by the Ohio Bureau of Workers' Compensation ("OBWC") prior to submitting a Bid and provide, on the Bid Form with its Bid, certain information relative to their enrollment in such a program; and, if awarded a Contract, shall comply with other DFSP criteria described in Section 1.6 of the Modified General Conditions. Bids will be received for: Estimate All Work Bid Package 1 -Base Bid-South HS ............ $887,500 Alternate 1.1- Utilize SBS Modified Bituminous roofing in lieu of EPDM membrane $165,000 All Work Bid Package 2 -Base Bid-Emerson ES` ....... $250,000 The Contractor is responsible for scheduling the Project, coordinating the Subcontractors, and providing other services identified in the Contract Documents. The Bidder shall submit a Bid Guaranty with the Bidder Bid, payable to Owner, in the form of either: 5.1.1.1 the signed Document 00 43 13 - Bid Security Form contained in the Contract Documents for the amount of the Base Bid plus all additive Alternates; or 5.1.1.2 a certified check, cashiers check, or letter of credit, for 10 percent of the Base Bid, plus all additive Alternates - a letter of credit shall expressly provide that it is revocable only by Owner. Bid Results: Bid Package 1 FEY Roofing and Sheet metal -$ 647,300.00 Bid Package 2 Revere Roofing-$ 139,600.00

Bid Results

Educational

$786,900.00

Public - City

Renovation

4

11

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
56
Bidding Soon
1,135
All Active Projects
487
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2022

June 14, 2022

img_map_placeholder

Multiple Locations, Westerville, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.