Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a bridge / tunnel in Bridgewater, Massachusetts. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Structural Steel for The High Street Bridge Replacement. The work under this contract consists of providing the structural steel for the High Street Bridge replacement superstructure and delivered to the Roadways Department of Bridgewater, 151 High Street. The structural steel shall conform to M270 grade 50. All materials shall be delivered to the site no later than 6/30/22. The structural steel consists of (6) - W36x194 steel beams and steel diaphragms - W33x118, W27x94, MC18x42.7, W4x13, L3x3x3/8, and 1/2 thick plates.

Post-Bid

Bridges / Tunnels

$250,000.00

Public - City

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
724
Active Projects
367
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2022

June 30, 2022

Project location map

151 High St, Bridgewater, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed