BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 9, 2022 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Plymouth, Massachusetts. Completed plans call for site work for a water / sewer project.

Replacement of the existing 12-inch water main crossing of the Eel River on Warren Avenue (RT-3A)DOT Bridge P-13-002; Replacement of the existing 8-inch water main crossing on Jordan Road, DOT Bridge P-13-035; installation of new water main and appurtenances; water main bypass and associated work. Contractor Qualification Highway Division To bid on this project Contractors must be prequalified by MassDOT in accordance with 720 CMR 5.00 Prequalification of Contractors by MassDOT. MassDOT prequalification of contractors with the class of work as, Sewer and Water, for the project with an estimated value of $700,000 will be required Deadline for Questions: Friday June 3rd, 2022 @ 4:00 PM local time.

Bid Results

Water / Sewer

$901,554.00

Public - City

Site Work

28

9

7

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
274
Bidding Soon
3,461
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2022

July 8, 2022

Project location map

Multiple Locations, Plymouth, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.