Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition and remodeling of an educational facility in Saint Louis, Missouri. Completed plans call for the remodel of a two-story above grade educational facility.
a) Project Summary i. This project scope consists of interior renovation in two general areas of Litzsinger School. One area of renovation includes existing office and classroom space to be renovated into (3) three classrooms (each with various levels of renovation) and the other area of renovation includes existing toilet rooms, custodian closet and part of an Art Room renovated into Social Workers office suite, toilet rooms, custodian closets, Calming Room and SOR rooms. This project also has a MEP/FP work scope. b) Mechanical i. Demo all HVAC within existing restrooms. All existing equipment to remain with exception to one blower coil unit being replaced. Owner is pre-purchasing blower coil unit. ii. Demo existing mini-splits. iii. Install new blower coil unit and reconnect existing piping. Install new electric reheat VAV system associated with blower coil unit. iv. New supply and exhaust ductwork served from existing systems. v. Two new exhaust systems serving new toilet room and existing data room. vi. ACES Controls vii. Blower boil work to be completed this summer. c) Electrical i. Existing power and lighting demolition within indicated areas. Pre-Bid Agenda Litzsinger School Phase II Page 2 of 3 ii. New power to be fed from existing panels with existing or newly freed up space. iii. Existing feeders currently fed through tunnel must be intercepted and rerouted within tunnel due to renovation. iv. Work in existing areas to be completed during summer or outside of school hours. v. Work is occurring immediately around existing IDF rack. IDF to be protected during construction. vi. Wiremold locations where indicated to be coordinated with Architect prior to install. d) Plumbing i. Plumbing scope includes demolition of all existing sanitary, domestic and vent piping within existing restrooms. Sanitary can be capped and abandoned. ii. New work involved sawcutting and floor slab replacement for new sanitary lines and one relocated roof drain. Sawcutting to be completed during the summer or outside of school hours. iii. New domestic piping extended up from tunnel underneath spaces and routed through the ceiling to new water loads. System will need to be drained for tie ins. iv. New vent piping connected to existing vents through roof. v. New single toilet in Annex to reconnect to existing piping from demolished toilet room in boiler room below. e) Fire Protection i. Fire protection work is design/build to relocate sprinkler head drops as required into newly renovated areas. Some vandal proof heads are required. As such, the District has established a MBE/WBE/DBE/SDVE combined goal of 15%. *As of February 1, 2023, addendum 1 has been issued.
Award
Educational
$958,000.00
Public - City
Demolition, Remodeling
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 16, 2023
April 17, 2023
1004 Litzsinger Rd, Saint Louis, MO
Related To This Project
Saint Louis, MO
Bid Date: Jun 03 2022
Saint Louis, MO
Bid Date: Apr 19 2022
Saint Louis, MO
Bid Date: Jun 14 2022
Saint Louis, MO
Bid Date: Jun 14 2022
Saint Louis, MO
Bid Date: Jan 13 2023
Saint Louis, MO
Bid Date: Nov 21 2023
Saint Louis, MO
Bid Date: Dec 15 2022
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Jun 13 2022
Saint Louis, MO
Bid Date: May 24 2022
Saint Louis, MO
Bid Date: Apr 19 2022
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Oct 05 2021
Saint Louis, MO
Bid Date: Aug 19 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.