BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 9, 2022 at 8:00 PM

Updated November 15, 2023

Site work for a civil project in Aurora, Colorado. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

Question Acceptance Deadline 06/01/2022 04:00 PM EDT Questions are submitted online No Aurora Water is planning to construct an augmentation structure along that can divert water from the Brantner Ditch through a short pipeline to the Brighton Ditch. The purpose of this augmentation structure is to comply with the terms and conditions set forth in the final decree in Water Court case number 14CW3177. The project work includes construction of diversion structures, installation of gates and flow measuring flumes, conveyance pipes and box culverts, access bridges and necessary site improvement work. All necessary permits including USACE JD determination and required land acquisition work have been completed.

Post-Bid

Bridges / Tunnels

$200,000.00

Public - City

Site Work

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
85
Bidding Soon
1,331
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.