BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a service station / car wash facility in San Bernardino, California. Completed plans call for the renovation of a service station / car wash facility.

As of October 27, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Arrow Maintenance Facility (AMF) Hydrogen Fuel Upgrade Project: Hydrogen Fuel System (HFS) SBCTA, in partnership with the Southern California Regional Rail Authority ("SCRRA"), presents this Invitation for Bids (IFB) to prospective bidders interested in undertaking the delivery of the Arrow Maintenance Facility Hydrogen Fuel Upgrade: AMF Retrofit (AMF Retrofit or Project) in the City of San Bernardino. The goal of the AMF Retrofit is to modify the existing Arrow Maintenance Facility to support the testing and operations of a zero-emission multiple unit (ZEMU) rail vehicle. The ZEMU vehicle is a hydrogen fuel cell and battery hybrid multiple unit rail vehicle and will be integrated into SBCTA's Arrow service to reduce overall service emissions. SBCTA is procuring construction services for the AMF Retrofit to safely maintain the ZEMU vehicle. Scope of the retrofit includes, but is not limited to, ventilation, electrical and fire suppression system upgrades, hydrogen gas and flame detection, a new fire pump, charging facilities, added storage, a posted rail pit, and architectural, structural, civil and utility modifications as required. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages 5,000 Per Each Calendar Day of Delay Online Q&A Yes Q&A Deadline 09/21/2023 4:00 PM (PDT)

Bid Results

Service Station / Car Wash

$9,626,571.00

Public - County

Renovation

283

48

2

7

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
593
Active Projects
255
Bidding Soon
3,415
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2023

November 1, 2023

Project location map

958 W 3rd St, San Bernardino, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.