Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

Renovation of a water / sewer project in San Rafael, California. Completed plans call for the renovation of a water / sewer project.

** As of April 17,2025 , this project has not yet been awarded. A timeline for award has not yet been established.** The Las Gallinas Valley Sanitary District is seeking proposals for the design and installation of an approximately 1 MW solar photovoltaic (PV) system. The scope of work includes the removal of the existing ~600 kW solar PV system and associated equipment, the reuse of existing infrastructure as appropriate, and the construction of the new system according to the documents that follow The District reserves the right to reject any and all proposals and/or to waive any irregularities to the extent permitted by law Question Deadline 02/14/2025 A Obtain pricing for the capital purchase for a new PV system. B Remove and dispose of 3 central inverters and unused transformers from the existing PV system. C Remove approximately 2,500 existing solar PV panels. Palletize the solar panels and support the loading of the panels onto trucks for offsite disposal. The District will be responsible for the costs of disposal and recycling. D Repurpose existing racking system as appropriate. The District will be responsible for the structural integrity of the existing concrete grade beam foundation and vertical steel column supports. E Install a 1 MW solar PV system. GENERAL A Removal and disposal of the existing inverters and transformers, as appropriate. B Removal existing solar PV panels. Palletize the old panels and support the loading of the panels onto trucks for disposal. C Design and installation of a new 1 MW solar PV system. D The District is the permitting authority for the Project. E Obtain City of San Rafael and County of Marin Fire Department jurisdiction approval for fire access. F If transformers have long lead times, the existing transformers could be used temporarily for partial PG&E Permit to Operate (PTO). G Prevailing wages are required. H The District will retain ownership of all environmental attributes of the energy systems (Renewable Energy Credits (RECs), Carbon Credits, etc.).

Bid Results

Water / Sewer

$3,813,412.00

Public - City

Renovation

16

7

5

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
180
Bidding Soon
3,322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2025

May 7, 2025

Project location map

300 Smith Ranch Rd, San Rafael, CA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed