Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 5, 2024 at 8:00 PM
Updated July 6, 2024
Site work for a civil project in San Rafael, California. Conceptual plans call for site work for a development; and water / sewer project.
The Marin City pond serves as the stormwater collection point for all the drainage in the Marin City watershed as well as flows from the Highway 101 interchange. The pond and freeway drainage has flooded the southbound lanes of Highway 101 as well as the single roadway into and out of Marin City during several storm events, most recently in 2021 resulting in a loss of emergency access during these larger storm events. This project will increase the flood conveyance from the pond by installing a pump station and floodwall from the pond trhrough the exisitng culvert to the Bay in conjunction with other improvements including a floodwall, new sotrmdrain pipe from Donahue, installation of flap gates and other pipe improvements. These elements were identified as critical baseline improvmenets in the Flood Study conducted by the District with a partial TAM grant in 2018. The District has applied for a new scope and budget under our FEMA grant and is currently working with CalOES and FEMA staff to increase the budget to approximately $12M up from our current budget of $4M. As of July 5, 2024, this project is in the design phase. Permitting for the project has not started as of yet. A firm timeline for bidding and construction have not been established. Project is included in the Marin County's FY 2022-2027 CIP. As of September 7, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated in 2022/2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Conservation and Development
$14,100,000.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
