BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Pilesgrove Township, New Jersey. Conceptual plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of October 13, 2022, an engineer has been selected for the project. Construction is estimated to take place in spring of 2023. *The closed solicitation has been included below for reference: This project involves improvements to comply with the Americans with Disabilities Act at the Township's Marlton Park. The proposed Phase 1 improvements include the following items necessary to comply with ADA: (1) Accessible Parking Spaces, Signage and Pavement Markings, (2) Repair of Existing Paved Paths, (3) New Paved Paths, (4) Accessible Ramp for Access to Playing Fields, (5) ADA Improvements to Existing Restrooms, (6) ADA Compliant Drinking Fountain and (7) Concrete Sidewalk. The project budget is $260,000 including construction, engineering and administrative costs. The Township is seeking engineering services to include surveying, design, preparation of bid specifications, assistance with bidding, construction administration, inspection services and as-built drawings. Proposals should address, and will be evaluated based upon, the following items/criteria and numerical point values: -successful provision of engineering services for similar projects 40 points -ability to provide comprehensive scope of services 30 points -ability to complete project by December 31, 2023 15 points -proposed cost of services including current staffing hourly rates 15 points Total 100 points The Township of Pilesgrove reserves the right to reject any and all proposals submitted. All costs related to preparation of the proposal response shall be borne by the proposer. Minority and women business enterprises (MBE and WBE) and Section 3 business concerns are encouraged to respond. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Playgrounds / Parks / Athletic Fields

$260,000.00

Public - City

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
111
Bidding Soon
2,498
All Active Projects
1,140
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

img_map_placeholder

123 Marlton Rd, Pilesgrove Township, NJ

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.