Site work for a water / sewer project in Tillman, South Carolina. Completed plans call for site work for a water / sewer project.

Award Details Contract Award Date: Aug 10, 2022 Contract Award Number: W912HN22C5004 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: XBSEBN2FMKA6 Contractor Awarded Name: Ashridge Inc Contractor Awarded Address: Bonneau, SC 29431-3545 USA Base and All Options Value (Total Contract Value): $13785445.00 NAICS Code: 237990 - Other Heavy and Civil Engineering Construction Size Standard: $39.5 This synopsis is for the Jones Oysterbed Island (JOI) Dredged Material Containment Area (DMCA) Dike Raising and Weir Improvements, Savannah Harbor, Jasper County, South Carolina. This acquisition is being offered as a 100% Small Business set-aside solicitation and will result in a single Firm Fixed Price Contract Award. The magnitude of this requirement per DFARS 252.236.204 is between $10,000,000 and $25,000,000. Project Location: Savannah Harbor is located at Savannah, Chatham County on the northern coast of Georgia and the southern coast of Jasper County, South Carolina. Dredged Material Containment Area JOI is located in Jasper County, South Carolina. JOI has only two access points by water only, both on the western end of the island (Atlantic Intracoastal Waterway) adjacent to Fields Cut. A floating dock and barge ramp are available for use for pre-bid site visits and during construction. The east end of JOI is owned by USFWS and the West end of JOI is owned by Georgia Department of Transportation. Center coordinates are approximately 324'32.97"N and 8056'53.70"W. Project Description: Jones/Oysterbed Island (JOI) Dredged Material Containment Area (DMCA) is primarily for disposal of the maintenance material that will be excavated during dredging of the Savannah River as part of the on-going Savannah Harbor Navigation Project. In order to restore capacity for placement of dredged material from the on-going maintenance of the Savannah Harbor Navigation Project, the storage capacity of the JOI DMCA will be increased, and improvements made to the water control structures (weirs). The Scope of Work for this project consists of raising the JOI DMCA perimeter dike by approximately six (6) feet, raising the bird island containment dike, rehabilitation of the five (5) existing weir/water control structures across the back (marsh/north-side) dike, and regrading and raising of the barge landing, access ramp, and dredge pipe ramps. The existing perimeter dike currently spans a length of approximately 44,000 feet and has a crest elevation ranging from about 28 to 31 feet MLLW. The dike will be raised to a uniform crest elevation of 35 feet MLLW to gain additional capacity for containment of Savannah Harbor dredged material. Approximately 1,000,000 cubic yards of borrow material from the interior of the DMCA will be required for the raising. The borrow material consists of dredge spoils from the Savannah River. The dike construction will be performed to the inside of the existing dike crest and slope. Repairs and modifications to the existing weirs will involve removal and replacement of all existing weir framing, addition of new timber bents, addition of two new catwalks at each weir, addition of new weir platforms, addition of new out fall pipes, addition of new catwalk abutments, removal of existing composite sheet piling, removal and replacement of existing weir ladders with new fall protection anchor points, removal of existing foundations and foundation piles, repair of cracked plastic weld connections, installation of pipe-mounted walkway sections to outfall pipes on invert-out side of the dike, and installation new slab foundation and foundation piles. The existing barge landing at the western end of the island, and dredge pipe ramps along the river side of the island will also be raised and re-graded. The fill material for all earthwork will be obtained from the interior of the DMCA. Additional project requirements include clearing, grassing, and erosion control provisions. The estimated construction duration for the Savannah Harbor Dredged Material Containment Area (DMCA) JOI Dike Raise is 450 days. Evaluation Criteria: The contract will be solicited and procured using Sealed Bidding Procedures under FAR Part 14. NOTE: This solicitation will be issued in electronic format and is anticipated to be available on or about June 1, 2022. Please note that only authorized transmission method for proposals in response to this solicitation is electronic format via the PROCUREMENT INTEGRATED ENTERPRISE ENVIRONMENT (PIEE), no other transmission methods (email, facsimile, regular mail, hand carried, etc.) will be accepted. The Offeror's Bid must be received by the Government by the by the date/time specified in the solicitation. Offerors shall submit their proposal using the following link: https://piee.eb.mil/. The bid opening date will be specified in the solicitation when issued. No additional media (CDROM, floppy disks, faxes, etc) will be provided. Any prospective Offeror must register in System for Award Management (SAM) at https://www.sam.gov After completing SAM registration, interested Contractors and their subcontractors must then follow the instructions listed in the solicitation documents to obtain access to the plans and specifications for this solicitation. Contractors that have an existing account should be able to use their existing logins to search for the solicitation number once it is released at https://www.sam.gov. It is the Offeror's responsibility to check the internet address provided in the solicitation as necessary for any amendments that may be posted to this solicitation. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. Please refer to https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml for instruction posted at the PIEE website for vendor user registration. Please refer to https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml for all instructions and training posted at the PIEE website to include posting an oer and proposal manager functions, roles, and capabilities. Please refer to https://dodprocurementtoolbox.com/site-pages/solicitation-module for additional instructions to include frequently asked questions and vendor access instructions. Contractual questions should be forwarded to the Contract Specialist, Amy L. Collins at Amy.L.Collins@usace.army.mil or the attention of the Contracting Officer, Whittni C. Hiscox at Whittni.C.Hiscox@usace.army.mil The contracting office address is 100 West Oglethorpe Avenue, Savannah, Georgia 31401. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$13,785,445.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
77
Bidding Soon
964
All Active Projects
445
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 7, 2022

September 7, 2022

December 1, 2023

img_map_placeholder

Multiple Locations, Tillman, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.