BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2022 at 8:00 PM

Updated November 14, 2023

Site work for a mixed-use development in San Rafael, California. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

The Scope of Work is described as follows: Furnishing all required labor, materials, transportation, equipment, incidentals, and services for construction of new Park Maintenance Facility Exterior West Courtyard including site preparation, grading, concrete stem walls, area drainage, fences, & and design/build rolling gate as shown on the plans and specifications. Note: For horizontal boards at fencing and gates, Base Bid shall include 1x4 S4S Thermally-cured Ash by Thermory, (or equal if approved by Architect.) In addition, there are four (4) Additive Alternate (Add Alt) Bid Items, as follows: Add Alt 01: East Courtyard including fencing on concrete stem walls, rolling gate, and compacted gravel surface. Add Alt 02: New perimeter pathway, as defined in plans and bid documents. Add Alt 03: Horizontal Boards for Fencing and Gates to be 1x4 S4S Ipe. Add Alt 04: Horizontal Boards for Fencing and Gates to be 1x4 S4S Kiln-dried, Clear All-Heart Redwood. The successful bidder shall furnish a payment bond and a performance bond. The Marinwood Community Services District reserves the right to reject any or all bids and the right to waive any irregularities.

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - City

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
515
Active Projects
279
Bidding Soon
2,823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2022

July 7, 2022

Project location map

775 Miller Creek Rd, San Rafael, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.