BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 19, 2022 at 8:00 PM

Updated September 14, 2023

Site work and renovation of a mixed-use development in East Fayetteville, North Carolina. Completed plans call for site work for a sidewalk / parking lot; and for the renovation of a educational facility.

Fear High School - concrete breezeway #1 and #2 structure restoration and Douglas Byrd High School outside wall area. There will NOT be a Pre-Bid Conference for the Re-Bid of this project. Bid Bond is not required but Performance and Payment Bonds are required. Certain MBE guidelines must be followed. The Owner reserves the right to reject any or all bids and waive informalities.

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
156
Bidding Soon
1,829
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2022

August 17, 2022

Project location map

Multiple Locations, East Fayetteville, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.