Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a playground / park / athletic field in Loma, Colorado. Conceptual plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.
The scope of work detailed above may be altered to add or remove items, as determined necessary by the State, before or after an award has been made and a contract entered with the selected consultant. The contract award in the long term may encompass all elements of the scope of work described above but will likely be awarded in phases as dictated by funding and timing of work. Furthermore, the State reserves the right to cancel the contract at any time and may resolicit as needed. The intent of this project is to make the Highline West Master Plan a reality. The initial construction budget is $4 million, although that may expand in the future. The initial design budget will be negotiated with the selected Consultant, based on the initial construction budget. The selected Consultant Team will review the plan and work with CPW to prioritize development activities, gather site data, develop design documents, support bidding, and provide construction oversight support for, but not limited to the proposed services: Questions Due in writing to mike.havens@state.co.us 5/26/2022 by 10:00 am The method of contractor selection has not been determined at this time
Conceptual
Playgrounds / Parks / Athletic Fields
$4,000,000.00
Public - State/Provincial
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2023
1800 11 8/10 Rd, Loma, CO
Related To This Project
Loma, CO
Bid Date: Jan 27 2023
Loma, CO
Bid Date: Sep 18 2023
Loma, CO
Bid Date: Nov 14 2023
Loma, CO
Bid Date: Apr 04 2024
Loma, CO
Bid Date: May 06 2022
Loma, CO
Bid Date: Feb 12 2021
Aspen, CO
Bid Date: Mar 28 2022
Northglenn, CO
Bid Date: Apr 06 2022
Hayden, CO
Bid Date: Mar 03 2022
Fort Collins, CO
Bid Date: Jul 28 2022
Loveland, CO
--
Limon, CO
Bid Date: May 06 2022
Edwards, CO
Bid Date: May 26 2022
Bennett, CO
Bid Date: May 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.