BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a water / sewer project in Fairhope, Alabama. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

Construction Water Treatment Plant No. 3 Expansion Project No. Wa002-22 Water Treatment Plant No. 3 Expansion A Summary of the Work Items Is Included Below: Install a New Well Pump. Construct a New Treatment Building to Include Finished Water Pump Station, Electrical Room, and Chemical Room. Seflective Demolition and Reconfiguring the Existing Treatment Building, Clearwell, and Finished Water Pump Station Structure. New Fluoride, Sodium Hypochlorite, Liquid Lime, and Phosphate Chemical Feed Systems. Yard Piping to Accommodate the Improvements. Electrical Improvements. The Work of Constructing the Project Will Be Let Under One Contract if an Award Should Be Made; and the Owner Reserves the Right to Select the Bid Considered by the Owner to Be in the Best Interest of the Owner. A Cashier's Check or Bid Bond Payable to City of Fairhope in an Amount Not Less Than Five (5) Percent of the Amount of the Bid, but in No Event More Than $10,000, Must Accompany the Bidder's Proposal. Performance and Payment Bonds and Evidence of Insurance Required in the Bid. All Bidders Bidding in Amounts Exceeding That Established by the State Licensing Board for General Contractors Must Be Licensed Under the Appropriate/applicable Provisions of State Law, and Must Show Evidence of License Before Bidding or Bid Will Not Be Received or Considered by the Engineer; the Bidder Shall Show Such Evidence by Clearly Displaying His or Her Current License Number on the Outside of the Sealed Envelope in Which the Proposal Is Delivered. The Owner Reserves the Right to Reject Any or All Proposals and to Waive Technical Errors if, in the Owner's Judgment, the Best Interest of the Owner Will Thereby Be Promoted.

Award

Water / Sewer

$7,589,893.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
39
Bidding Soon
484
All Active Projects
197
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

July 18, 2022

img_map_placeholder

To Be Determined, Fairhope, AL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.