BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Holladay Cottonwood, Utah. Working plans call for site work for a road / highway.

Project is located at the intersection of Highland Dr and Murray Holladay Road, Holladay, UT. The northwest corner is located in Millcreek City. This courtesy posting is an advertisement of a procurement opportunity for City of Holladay, not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The Division of Purchasing does not accept responses for courtesy postings. The contract award for this solicitation will not be posted on this website. Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendors response will still be evaluated by City of Holladayas described in the solicitation document. The Division of Purchasing is neither the issuing or conducting procurement unit for this solicitation, as such it is the vendors responsibility to review the entire solicitation in order to comply with any requirements. Works to be constructed include the following scope of work: 1. Traffic control 2. Asphalt Removal 3. Trenching 4. Supply and install of conduit 5. Trench backfill 6. Roadbase 7. Concrete repairs Bids are to be submitted on the enclosed Bid Form. The bids shall consist of a lump sum bid and shall include all costs for labor, materials, and other associated work items. Bid Form is to be signed. Contractor will be required to obtain a no fee permit Right-of-Way Occupancy Permit from the City of Holladay. Substantial completion to occur on or before July 20, 2022. Final completion to occur on or before July 31, 2022. All traffic control is to be removed between substantial and final completions. Bids shall be evaluated based on lowest bid amount. Bonds are not required on this project. Cities are to be named as additional insured on insurance certificates.

Final Planning

Roads / Highways

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
28
Bidding Soon
550
All Active Projects
257
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

December 17, 2022

img_map_placeholder

Multiple Locations, Holladay Cottonwood, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.