Published July 12, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a mixed-use development in New York, New York. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

Playground/Flood Elimination Performance Period: 365 Continuous Calendar Days (See Page CC-3 and Appendix B) Liquidated Damages: Two Thousand ($2,000) Dollars per Continuous Calendar Day and as set forth in the Construction Contract Page CC-3 and Appendix B SCA system-generated category: $0 to $250,000 (not to be interpreted as a "bid range") $250,001 to $500,000 $500,001 to $1,000,000 $1,000,001 to $4,000,000 $4,000,001 and Above Please make sure you have a scanned image of the required submittal, ready to re-send to the Specialist, in case when he or she reads aloud the bids that have been received, and does not read your firm's name. We have NO REASON to expect this to be an issue but we are asking everyone to be doubly sure bids are prepared in advance. . Please make sure that you are prequalified to perform work greater than One Million ($1,000,000) Dollars if your bid is in excess of $1,000,000 and that your firm have the applicable experience for this scope of work as of the bid opening date and time. INSURANCE See specific Contractor-furnished insurance requirements and SCA-furnished Insurance Coverage, Builder's Risk Coverage and Deductibles, the Owner Controlled Insurance Program (OCIP). The OCIP Manual is available. BID BREAKDOWN: THE APPARENT LOW BIDDER, FOR THIS PROJECT IS BEING ASKED TO PLEASE BE PREPARED TO SUBMIT TO THE SCA ITS BID BREAKDOWN USING THE SPECIFIC TEMPLATE SENT, IMMEDIATELY OR WITHIN TWENTY-FOUR (24) HOURS AFTER THE BID OPENING. Construction Contract is the Phasing Exhibit for this Project. ALLOWANCE(S): Bidders are to include in their Lump Sum Bid Amount a total allowance amount for $12,000 as specified in Technical Specification Section S01010 "Summary of Work", Article 1.03. LUMP SUM BID Bidders shall submit a LUMP SUM BID AMOUNT in the form attached as Appendix A to the Construction Contract to complete the project within the "Performance Period" after normal school hours under the conditions specified in the Contract Documents (as defined in the SCA's General Conditions dated July 1, 2021) inclusive of the Phasing Exhibit. A Bid Bond prepared on the form attached to the Construction Contract as Appendix C or a Certified Check of the Bidder for five (5%) percent of the Bid Amount must accompany the Lump Sum Bid Form. (Appendix A). A "Wicks" subcontractor is defined as a subcontractor performing construction work in the HVAC, Plumbing & Gas Fitting or Electrical Trades and (except for HVAC) licensed to do business in the CITY OF NEW YORK in that trade. The SCA has determined that: 1) the value of each of the "Wicks" trades under the solicitation is less than $10,000 or; 2) there is no "Wicks" trade work under this solicitation. Therefore, the bidder is not required to complete and submit with its bid the "Wicks" Subcontractor Request Form (Appendix G). As a condition of award under this Solicitation, the SCA will require the lowest responsive, and responsible bidder and its subcontractors of any tier performing Work on this project to become signatory to, and be bound by, the provisions of the Project labor Agreement (PLA) newly executed on the 25th of August, 2020. The PLA applies to the Work performed under this solicitation and bids must be prepared in compliance with the PLA. The PLA can be accessed electronically Project Labor Agreement, and then see below for Project Labor Agreement covering Fiscal Years 2021 - 2025. The Bidder is required to execute a PLA Letter of Assent (in the form of Appendix L to the Construction Contract) pursuant to which it agrees to become signatory to, and abide by, the provisions of the PLA. This PLA Letter of Assent will be issued at the time of the Notice of Intent to Award letter. The Bidder must sign and return this document to the SCA along with the required Construction Performance and Labor and Material Payment Bonds. Failure to submit this PLA Letter of Assent will render the Bidder to be non-responsive and therefore, ineligible for award of a contract under this solicitation. QUESTIONS REGARDING THE CURRENT PLA SHOULD BE DIRECTED TO DEBORAH SEIDENBERG, PRINCIPAL ATTORNEY, LEGAL, AT EMAIL: DSEIDENBERG@NYCSCA.ORG OR TELEPHONE NUMBER: (718)472-8496. PRE-QUALIFICATION Pursuant to the SCA's authorizing legislation, contracts will only be awarded to contractors prequalified by the SCA. If the Bidder is not prequalified at the time of the bid opening its bid will not be accepted. Please check all three (3) lists (disqualified, suspended, and otherwise ineligible) when conducting a search to obtain the complete prequalification status of a firm appearing on the SCA's electronically. Bidders can ensure their eligibility for contract award by verifying that they are currently prequalified. All inquiries regarding prequalification status should be directed to the SCA's Prequalification Dept. at (718)472-8777. All questions by prospective bidders concerning this solicitation should be directed, in writing at least three (3) business days prior to the originally scheduled, or, if applicable, postponed bid opening date to Donna Hendricks, at E-mail: dhendricks@nycsca.org, Phone Number: (718)472 8823.

Award

Water / Sewer

$3,086,919.00

Public - City

Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Field Samples, Mockups, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Structure Demolition, Site Remediation, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Common Work Results for Masonry, Masonry Grouting, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications, Metal Railings, Metal Gratings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Windows, Roof Windows and Skylights, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment, Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures, Collection and Disposal Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire Pumps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Radiators
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Security Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Roadway Subgrade Reshaping, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees, Planting Accessories, Tree Grates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
479
Active Projects
292
Bidding Soon
5,292
All Active Projects
2,254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2022

August 8, 2022

img_map_placeholder

1581 Victory Blvd, New York, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Playground/Flood Elimination

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.