BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Colorado Springs, Colorado. Completed plans call for the renovation of a transportation facility; for site work for a transportation facility; and for paving for a transportation facility.

Addendum 1 and 4 are on the project, Addendum 2 and 3 are Q/A sheets. Please see owner for Addendum 5. PROJECT DESCRIPTION The project consists of concourse modernization and roadway replacement/rehabilitation projects (collectively "Concourse Modernization Project"). The project site is at the Colorado Springs Airport (COS). The COS Concourse Modernization Project consists of project phase packages, of which some elements may be constructed simultaneously and/or with multiple phasing requirements. o Package 1: Complete Concourse Modernization -This package includes internal modernization of the entire COS Concourse building with a phasing element. This project package includes: (i) complete replacement of all concourse building restrooms; (ii) interior wall demo/install; (iii) complete window replacement; (iv) new flooring/materials throughout the building; (v) ADA compliant improvements throughout; (vi) replacement of the two main terminal building elevators; (vii) HVAC replacement; (viii) ceiling height increase; (ix) PA system/speaker replacement; (x) boiler replacement; and (xi)mechanical/electrical/plumbing modernization throughout. In order to maintain functionality and operability, the terminal modernization work will requirephasing. See Exhibit A. o Package 2: Baggage Handling Equipment - Oversize Baggage Handling - This package includes (i) the installation of an oversize baggage handling system; (ii) enclosing the approximately 8000sf of existing tug/cart passageway (iii) replacement and reconfiguration of the inbound baggage belt system; (iv) replacement of the HVAC; (vi) new wall installation; and (vii) modernization of mechanical/electrical. See Exhibit B. o Package 3: Milton E. Proby / RAC Rehabilitation - Milton E. Proby Parkway is the main road servicing COS. This project package includes: (i) mill/fill of the old and failing asphalt portions of the roadway; (ii) crack sealing; (iii) pothole repair; (full depth roadway system replacement in necessary areas; and (v) selective concrete panel repair and/or spall repair near the terminal on both upper and lower curbside areas. The Rental Car Area (RAC) project scope will include a selective mil/fill, striping, and cracking/spall repair. See Exhibit C Other Work: Other work elements may be added if the Airport determines that they are required to complete any of the above-referenced project packages and this description should not be considered exhaustive or all inclusive. Estimated Magnitude: $20,00,000 - $46,000,000 Goals for minority participation for each trade: 3.23% Goals for female participation in each trade: 1.39%

Post-Bid

Transportation Terminals

$46,000,000.00

Public - City

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
30
Bidding Soon
647
All Active Projects
274
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

February 16, 2023

img_map_placeholder

7770 Milton E Proby Pkwy, Colorado Springs, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.