BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in San Francisco, California. Completed plans call for the renovation of a one-story above grade municipal facility.

LBE Subcontracting Participation Requirement is 22% LBE 9.2% MBE; 3.7% WBE; 9.1% OBE. This project involves the renovation of the 2nd floor Men/Women restrooms in an 8-story office building, originally built in 1959. The restrooms were previously renovated in 1989. Those restrooms will be combined to form a single all-gender restroom. Within the defined work area, all finishes, toilet accessories, plumbing fixtures, light fixtures, partition walls and HVAC equipment shall be demolished and replaced to accommodate the new restroom layout. Modifications and upgrades to HVAC, plumbing, fire protection, electrical and lighting will be done to accommodate the new layout. The scope of work also include a new lactation room with sink. The building will be occupied during construction. REQUIREMENTS: (Refer to Project Manual for a complete list) 1) Class "B" license required to bid. 2) Pursuant to San Francisco Administrative Code ("Administrative Code") Section 6.25 and Chapter 25 of the Environment Code, "Clean Construction" is required for the performance of all work. 3) Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B. 4) LBE Subcontracting Participation Requirement is 22% LBE. 5) Good Faith Efforts. In accordance with Administrative Code Chapter 14B requirements, all bidders shall submit documented good faith efforts with their bids, except those who exceed the above stated LBE subcontracting participation requirement by 35%. Bidders must achieve 80 out of 100 points to be deemed responsive. Bidders wil receive 15 points for attending the pre-bid conference. Refer to C MD Form 2B. For details, contact Finbarr Jewell by phone at or by email at finbarr.jewell@sfgov.org. 6) For information on the City's Contractor Development Program, call (415) 986-3999 or email cdp@imwis.com 7) This Project shall incorporate the required partnering elements for Partnering Level 1. Refer to Section 01 31 33 for more details. CONTRACT DURATION: 90 consecutive calendar days from NTP to Substantial Completion. A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany each bid. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to include performance and payment bonds for 100% of the contract award. Class B license is required to bid

Post-Bid

Municipal

$1,000,000.00

Public - City

Renovation

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
356
Active Projects
174
Bidding Soon
3,245
All Active Projects
1,337
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 22, 2022

July 22, 2022

img_map_placeholder

S Van Ness Ave, San Francisco, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.