BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Neosho, Missouri. Completed plans call for site work for a water / sewer project.

https://www.joplinglobe.com/news/local_news/neosho-accepts-bid-for-lime-kiln-dam-renovation/article_3d3ab7f0-fd5d-11ec-8f1d-57a2b5fc42f0.html Work could begin in the fall to remove a drowning hazard at Lime Kiln Park on Shoal Creek. The Neosho City Council on Tuesday approved a construction bid to fill in the dam at Lime Kiln Park and replace it with a series of rapids. In development since 2019, the project will fill in a drowning hazard and allow native aquatic species to travel back upstream, while keeping the dam intact for the city's water supply. The council chose a bid of $474,292 from Granger Dirtworks, of Neosho, with a 5-0 vote. Council members Ashton Robinson and Charles Collinsworth were absent from the meeting. A contract is expected to be considered during upcoming meetings. If that contract is approved and signed, work could begin as soon as this autumn. "We know that the lowest flow of the creek happens in August, September, October," said Richard Leavens, the city's director of Development Services. "According to the engineers, the construction will not be difficult. We just have to wait for the flow-down." Built on Shoal Creek in northern Neosho, the low-head dam stretches across the creek's banks. Engineers and paddlers say these types of dams are particularly dangerous. The website practical.engineering calls a low-head dam "a drowning machine." When water levels are low, the dams are not as hazardous. But when water increases after rains, the spillover creates a vortex on the downstream side that is difficult to escape, making rescue attempts almost impossible. The dam has been cited in the deaths of five people since 2015. In May 2021, 12-year-old Kaylin Brown was lost to the waters, with her body being discovered more than 3 miles downstream four days later. Taylor Hicks, 34, died of injuries sustained while trying to rescue Brown. The project calls for creating a rock ramp on the downstream side of the dam. The ramp would fill in the drop that causes the vortex and create a rocky rapids area that extends for about 220 feet. In 2020, a paddling expert said that under the standard water classification used by canoeists and kayakers, the project would create Class 2 rapids, which would not present difficulty for paddlers with intermediate abilities. Such rapids are marked by medium to quick flowing water, regular waves, and clear and open passages between rocks and ledges. Conservationists say the rapids would allow downstream species to migrate upstream, including endangered and threatened mussels. Funding for the project comes from a U.S. Fish and Wildlife Service grant. Scott Hamilton, a biologist with the department, said in 2020 that the project is part of a focus to restore Shoal Creek to its state before mining activity occurred. _____________________________________________________________________________________________________________________________________________________________ The work to be performed under this contract generally consists of the construction of a rocky ramp to provide fish passage for native species and for non-motorized boating recreation. Work includes, but is not limited to, grubbing/debris removal, dredging, furnishing, and installing riprap, temporary flow diversion, cofferdams, vegetative restoration, and other incidentals necessary for a complete project. Completion- 120 consecutive calendar days

Award

Water / Sewer

$474,292.00

Public - City

Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
24
Bidding Soon
559
All Active Projects
244
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

August 1, 2022

img_map_placeholder

Lime Kiln Drive and Business 60, Neosho, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.