Site work for a water / sewer project in Venice, Florida. Completed plans call for site work for a water / sewer project.

Managed the construction at least one microtunneling project with a construction cost of at least $1 million. Construction cost shall be the actual amount paid to the subcontractor performing the microtunneling work. The City is using this Request for Qualifications process to qualify microtunneling contractors, to participate as a subcontractor for this project. All work pertaining to the installation of the steel casing by MTBM shall be performed by a microtunneling subcontractor qualified through this RFQ process. Qualified microtunneling subcontractors can be included on one or multiple prime contractor's bids for the work. The City of Venice ("City") extends this Request for Qualifications ("RFQ") to request a Statement of Qualifications ("SOQ") from interested microtunneling contractors (the "Applicants") to be deemed qualified to participate as subcontractor performing all pipeline installation by microtunneling methods for the Second Force Main Under I-75 Project. The project involves the installation of approximately 1,800 linear feet (LF) of 24-inch diameter wastewater force main. The proposed force main will improve system redundancy and enable the City to convey additional flow from new development. This project includes two (2) trenchless crossings of the northbound and southbound lane of Interstate 75 (I-75). The two trenchless crossings are approximately 220 feet long each. A steel casing installed by microtunnel boring machine (MTBM) is specified for this project. A range of steel casing diameters, minimum of 42 inches and a maximum of 60 inches, have been permitted by the Florida Department of Transportation for these crossings. Casing and MTBM size to be selected by the contractor. The final day for questions and the due date for the Statement of Qualifications have been changed. The final day for questions is June 17, 2022 by 5:00 p.m. EST. Bid Bond not required

Post-Bid

Water / Sewer

$1,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
45
Bidding Soon
809
All Active Projects
318
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2022

August 2, 2022

img_map_placeholder

Multiple Locations, Venice, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.