BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 19, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Sun Prairie, Wisconsin. Completed plans call for site work for a water / sewer project.

Water Resources Infrastructure, Equip Repair, Water Resources Infrastructure, Sewer and Water Construction, Water and Wastewater Facilities, Water/Wastewater Infrastructure, Culinary Water Improvements, Water Infrastructure (Water Meters) Description: 62 Each Private Side Water Service Replacements Additonal Description: The successful bidder shall be required to conform to all Federal and State OSHA requirements as well as to the extent necessary to comply with all Davis-Bacon and/or Wisconsin Prevailing Wage laws. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Federal wage rates can be found at http://beta.sam.gov Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates use of Wisconsin DNR Safe Drinking Water Loan Program. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), Women's Business Enterprises (WBEs), and Small Businesses in Rural Areas (SBRAs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. Bids may be held by the City of Sun Prairie for a period not to exceed sixty (60) days from the bid opening of the bids for the purpose of reviewing the bids and investigating the qualifications of the bidders, prior to awarding of the Contract.

Award

Water / Sewer

$373,560.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
192
Bidding Soon
1,922
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2022

July 14, 2022

Project location map

Multiple Locations, Sun Prairie, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.