BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a fire / police facility in Sun Prairie, Wisconsin. Completed plans call for the renovation of a fire / police facility.

HEAT PUMP REPLACEMENTS CITY OF SUN PRAIRIE, WISCONSIN The City of Sun Prairie will be contracting for the removal and installation of two heat pumps located at the Police Department, 300 E Main Street. Scope of work includes removal and installation of 2.5-ton and 3.0-ton Carrier single stage water source heat pumps currently mounted in drop ceiling of first floor Police Department. Contact City of Sun Prairie Building Maintenance, 300 E Main St, Sun Prairie, WI, 53590, 608-825-0858.

Post-Bid

Fire / Police

$623,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
324
Active Projects
187
Bidding Soon
1,920
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2022

July 4, 2022

Project location map

300 E Main St, Sun Prairie, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.