BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a service station / car wash facility in Croton on Hudson, New York. Completed plans call for the demolition of a service station / car wash facility; for the construction of a service station / car wash facility; and for site work for a service station / car wash facility.

The Metropolitan Transportation Authority ("MTA"), by and through MTA Construction & Development Company ("MTA C&D"), will be issuing a two-step Request for Proposals ("RFP") seeking entities interested in providing design-build services for the replacement of two (2) Metro-North Railroad automotive refueling facilities located at Harmon Yard in Croton-on-Hudson, New York and Brewster Yard in Southeast, New York. In the first step, MTA C&D will issue a Request for Qualifications ("RFQ") seeking Respondents who are qualified and prepared in all respects to perform the work on schedule and within budget. In the second step, MTA C&D will issue an RFP for the contract to the Respondents determined by MTA C&D to be qualified in the first step. This Contract is for construction of one (1) new, state-of-the-art, vehicle fleet fueling facility to replace the existing underground storage tanks and fueling systems at each of two (2) separate train yard locations: (i) Harmon Yard, located in Croton-on-Hudson, New York in Westchester County; and (ii) Brewster Yard, located in Southeast, New York in Putnam County. The duration of the project is 20 months. The Design-Builder will be required to provide all planning, design, and engineering services as required for the proper and complete design and construction of the Project, including the final design of all plans, drawings, and technical specifications to meet MTA C&D's requirements. This contract will also decommission, demolish, and dispose of the entire existing fueling facilities including canopy structures, pump island equipment and facilities along with their deteriorated underground storage tanks (USTs), and fuel systems. The proposed replacement facilities have been sized to meet MNR's current and anticipated future needs, equipped with above-ground storage tanks (ASTs), and constructed in the approximate footprints of the current facilities. It is anticipated that this contract will be funded in whole or part by federal grants. Funding: 100% FTA Goals: 22.5% DBE Est $ Range: $1M -$5M Contract Term: 20 Months The purpose of this project is to replace two (2) Metro-North automotive refueling facilities located at Harmon Yard in Croton-on-Hudson, New York and Brewster Yard in Southeast, New York. This project will be a design-build project with a duration of 20 months. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Due to the sensitive nature of the project, reference documents will not be posted. Please obtain documents through the means listed in the invitation to bid.*

Post-Bid

Service Station / Car Wash

$5,000,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
509
Active Projects
311
Bidding Soon
4,265
All Active Projects
1,962
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2022

February 23, 2023

img_map_placeholder

Multiple Locations, Croton on Hudson, NY

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.