BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a municipal facility in Elberta, Utah. Working plans call for site work for a municipal facility.

This courtesy posting is an advertisement of a procurement opportunity for Northern Utah Environmental Resource Agency (NUERA), not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The Division of Purchasing does not accept responses for courtesy postings. The contract award for this solicitation will not be posted on this website. Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendor's response will still be evaluated by Northern Utah Environmental Resource Agency (NUERA) as described in the solicitation document. The Division of Purchasing is neither the issuing or conducting procurement unit for this solicitation, as such it is the vendor's responsibility to review the entire solicitation in order to comply with any requirements. During the Bidding period, all questionspertaining to the project or bid must be submitted in writing by noon on 6/9/2022 to Mark Lamoreaux mlamoreaux@northernutahera.org. Addenda will be issued to answer the questions. Owner shall oversee and approve the installation of engineered concrete pad, and Power Supply in preparation for the delivery and setting of the Blower-Utility Flare System. The Landfill Gas Collection and Control System (GCCS) Contractor will install piping to and from the Blower-Utility Flare System once it is properly set in place, and the electrical power supply will be provided and installed by the electrical contractor for the Blower-Utility Flare System. The Blower-Utility Flare System vendor shall provide prove-out services, start-up assistance, and training and testing services when all is ready. Installation of chain link fence and lights, and any other features that GCCS Contractor/Engineer/Owner feels is needed to provide safe and reliable operations of the GCCS in and around the Blower-Utility Flare System area will be installed prior to operations.

Final Planning

Municipal

$280,000.00

Public - State/Provincial

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
0
Bidding Soon
657
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

January 1, 2023

Project location map

6800 UT-68, Elberta, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.