Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Munster, Indiana. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
2023 Project Rebid Courtyard and Parking Lot Drainage and Improvements Munster High School 8808 Columbia Avenue Munster, Indiana 46321 A single General Contract to a General Contractor for all trades and scope of work included in the Project Bid Documents. Bidders shall ensure bid delivery. For bids being personally delivered, bidders are to follow the procedures at the Administration Center on the day of bids. Bidders shall ensure and confirm that their bids have been received by the Owner. Architect's Information: 1. J. Lake Architecture & Design 129 Quartermaster Court Jeffersonville, IN 47130 Owner reserves the right to reject any and all bids and to waive informalities and irregularities. All questions shall be directed to the Architect as follows: James Lake, AIA J. Lake Architecture & Design 502-802-8797 jamie.lake@jlakearch.com All bidders are responsible for all costs of any desired downloaded files and printed hard copies of drawings and/or specifications directly from the reprographics company at their cost for download, printing, and associated shipping and handling charges. All bidders are required to review, download, print, or otherwise obtain an entire and complete set of Construction Documents, including all Drawings, Specifications, and Addenda posted to the online plan room. The Architect and Engineers retain all copyright to all bid documents, both in digital and hard copy form, as instruments of their professional service and a product of their work. No bidder, supplier, or any other person or entity is permitted to use these documents for any purpose other than preparing a bid for this Project. All documents are on file at the offices of the Owner and the Architect. All questions shall be directed to the Architect as follows: James Lake, AIA J. Lake Architecture & Design 502-802-8797 jamie.lake@jlakearch.com B. All questions shall be submitted in writing via email. BID SECURITY A. Bid security shall be submitted with each bid in the amount of five percent (5%) of the total bid amount, including the Base Bid and all additive Alternate Bids. B. Bid security may be in the form of cashier's check, certified check, money order, or bid bond. C. The Base Bid may be held for a period of thirty (30) days before awarding the Contracts. D. Should a successful bidder withdraw their bid, or fail to execute a satisfactory contract within ten (10) days after notice of acceptance of their bid, the Owner may declare the Bid Security forfeited as liquidated damages, not as a penalty. BONDING A. Successful bidder shall provide a Performance Bond and Payment Bond in the amount equal to one hundred percent (100%) of the total Contract Sum. B. Bonds shall be from a surety company approved to conduct business in the state where the work is being performed. C. Bonds shall remain in full force and effect for a period of one (1) year after the date of final acceptance of the work. D. All costs for the Performance Bond and Payment Bond shall be included in the Base Bid price. It is the responsibility of all bidders to obtain all information and updates from the online plan room and reprographics company listed herein TIME OF COMPLETION A. The Owner intends to award the Project at their Board Meeting on Monday, March 13, 2023. B. Upon award, the Architect will issue a Notice to Proceed on behalf of the Owner. C. Upon receipt of the Notice to Proceed, the successful bidder shall begin the Work, file for the necessary approvals and permits, submit the required project documentation to the Architect, and prepare to mobilize on site. D. Summer Break 2023: The Contractor shall begin all work onsite beginning at the end of the school year and continue throughout the Summer Break, currently scheduled for May 25, 2023 through August 1, 2023. The Contractor will have full access to all areas of the school, courtyard, and parking lot, and at all times desired by the Contractor. E. Contractor shall achieve Substantial Completion of the parking lot by August 1, 2023. The intent is to complete the Work in the parking lot at the front of the school for practical use by the Owner prior to the return of students to school for the start of the Fall Semester 2023. This includes the excavations and installation required for the subsurface storm piping and structures, and the resurfacing and restriping of the asphalt surface. F. Contractor shall achieve Substantial Completion of the courtyard drainage by August 1, 2023. The intent is to complete the Work of the storm piping in the courtyard prior to the return of students to school for the start of the Fall Semester 2023.This includes the boring of the storm pipe between the courtyard and the parking lot, and the excavations and installation required for the subsurface storm piping and structures in the courtyard. G. Contractor shall achieve Substantial Completion of the courtyard surface by September 1, 2023. The courtyard does not need to be usable for students at the start of the Fall Semester 2023. This work remaining after school starts includes the installation required for the surface paver system and finalization of the work in the courtyard. H. For purposes of timing, if the Contracts are not awarded at the Board Meeting indicated, the Contract Time will be extended accordingly.
Award
Playgrounds / Parks / Athletic Fields
$348,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better projects. Build better bids. Win.
Elevate your business with the top source for commercial construction data. Get instant access to Project Search, and five free projects and companies. Subscribe for complete access to all contacts and documents to unlock opportunities and start winning more business today!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 6, 2023
May 25, 2023
8808 Columbia Ave, Munster, IN
Related To This Project
Munster, IN
Bid Date: Dec 28 2022
Munster, IN
Bid Date: Jul 06 2022
Munster, IN
Bid Date: Jul 15 2022
Munster, IN
--
Munster, IN
Bid Date: Jun 15 2022
Munster, IN
--
Munster, IN
--
Munster, IN
Bid Date: Aug 12 2022
Munster, IN
Bid Date: Apr 08 2022
Munster, IN
Bid Date: Apr 01 2022
Munster, IN
Bid Date: Apr 08 2022
Munster, IN
Bid Date: Dec 19 2022
Munster, IN
Bid Date: Mar 22 2022
Munster, IN
--
Munster, IN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--