BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Crystal River, Florida. Completed plans call for site work for a water / sewer project.

**As of August 15, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Citrus County, Florida ("County") invites interested parties to submit a Bid to provide complete construction of the Northwest Quadrant Force Main Extension Project to include approximately 22,240 LF of 10-inch PVC force main, 7,200 LF of 12-inch HDPE force main via directional drill, 3 lift stations, decommissioning of two existing package Wastewater Treatment Facilities, and general restoration of the project areas. All work shall be in accordance with the construction plans, special provisions, and contract documents. Minimum Requirements for Submitting a Bid Bidder shall meet, at a minimum, one of the following requirements to be determined a responsive and responsible Bidder at the time of Bid Submittal: 1. Certified General Contractors License 2. Underground Utility Contractors License Bidder's will be required to submit a Bid for the two projects "ITB 22-096 Northwest Quadrant Watermain Extension Project" and "ITB 22-098 Northwest Quadrant Wastewater Extension Project". County's intention is to award both projects to one (1) Contractor utilizing two (2) separate Agreements. Northwest Quadrant Watermain Extension project will be funded by U.S. Department of the Treasury through American Rescue Fund Act (ARPA) and the Northwest Wastewater Extension Project will be funded pursuant to the Restore Act Spill Impact Component and Florida State Expenditure Plan (FSEP) passed through the Gulf Consortium and State of Florida Department of Environmental Protection. Contractor will be required to follow the mandatory Federal provisions provided for each project. Davis Bacon Procedures will be required for the Northwest Quadrant Wastewater Extension Project and not the Northwest Quadrant Watermain Extension Project. Question End Date 6/17/2022 4:00 PM.

Bid Results

Water / Sewer

$9,922,441.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
65
Bidding Soon
859
All Active Projects
359
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2022

September 5, 2022

img_map_placeholder

Multiple Locations, Crystal River, FL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.