BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Rosenberg, Texas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Work of the Project generally includes replacement of the existing Lift Station No. 8. More specifically, the Work includes, but is not limited to, construction of the following Remove, transport and dispose accumulated sludge, grit, and solids from existing wet well of the lift station. Demolition including but not limited to pumps, piping, valves, and supports; electrical control panels, conduits, conductors, motor control centers, concrete pump bases, lift station top of slab concrete, reinforcement, and access openings, and all related appurtenances as included in the Specifications and shown on the Drawings. Furnish all labor, equipment, material and supervision necessary for the installation of two submersible pumps with cooling jackets, all piping, valves, fittings, brackets, cathodic protection, and piping supports, including painting, and other miscellaneous accessories and appurtenances necessary for the operation of the lift station as included in the Specifications and shown on the Drawings. Furnish, all labor, equipment, material, and supervision necessary for the installation of electrical and control components including but not limited to power system study, radar level instruments, electrical fused disconnect, junction boxes, conduits, conductors, duct banks, manual transfer switch, SCADA including but not limited to software, components, programming, monitoring and integration as included in the Specifications and shown on the Drawings. Furnish and apply protective coating system (Spectra Shield) as included in the Specifications and shown on the Drawings. Prepare subgrade and install reinforced concrete pavement as included in the Specifications and shown on the Drawings. Furnish all labor, equipment, material, and supervision necessary for the installation of fencing, gates, backflow preventer, yard piping, bollards and site improvements as included in the Specifications and shown on the Drawings. Install proposed detention pond as indicated on the Drawings and in accordance with the Specifications. Furnish and install 24-inch RCP storm sewer in accordance with the Specifications and as shown on the Drawings. Furnish and install hydromulch seeding and sodding as included in the Specifications and as shown on the Drawi Install cast-in-place top of slab for lift station structure as indicated on the Drawings and in accordance with the Specifications. If the amount of the bid exceeds $50,000.00, Official Bidders Bond signed by the Surety and Bidder, or a Cashiers Check in an amount equal to five percent (5%) of the total bid must accompany each proposal. successful bidder must furnish both a Performance Bond and Payment Bond upon the forms which are attached hereto and may also be required to furnish a Maintenance Bond in the amount of 100% of the contract price

Award

Water / Sewer

$2,052,426.00

Public - City

New Construction, Site Work

70

26

6

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
59
Bidding Soon
2,734
All Active Projects
1,117
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

April 29, 2024

img_map_placeholder

3102 West St, Rosenberg, TX


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.