Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Creston, Iowa. Completed plans call for the renovation of a municipal facility.
Award of the Contract shall be to the lowest responsive, responsible bidder determinedon the basis of a combination of the Base Bid and selected Alternates. Neither the Ownernorits agents will assume liability for the inability of the bidder to submit a bid in a timely manner.Bids received after the deadline will be rejected. Bidders bear full and complete responsibilityfor the timely submission of such bid. Time of receipt shall be the time recorded and determinedby the District or designee. The Work of the Project is defined by the Contract Documents and consists ofthe following: 1. New Public Works Facility comprised of a precast concrete-clad pre-engineered steel building containing parking bays, wash bay, shop area, storage areas, offices andassociated spaces. Bids will be received for the following: 1. General Contract, including Architectural, Structural, Mechanical, Electrical, Technology,and Civil . All bids shall be in accordance with Contract Documents prepared by FEH DESIGN , Which Contract Documents are made a part of this Advertisement by reference thereto. Cash deposits will not be accepted. MBI plan deposit cards are also an acceptable method for deposit for documents. When shipping/postage is required, therewill bea $20 non-refundable fee for each set of Bid Documents shipped. Deposit checks shall be made payable to FEH DESIGN . Postage checks shall be made payable to Beeline and Blue . Send all checks to Beeline and Blue . Each Bid shall be made on a form furnished by the Architect , and must be accompaniedby a certified check or cashiers check drawn on an Iowa bank, or BidBondtobeexecuted by corporation authorized to contract as a surety in the Stateof Iowa, intheamount equal to five percent (5%) of the amount of the Bid, made payable to the CityofCreston, Iowa , Creston , IA and may be cashed by the Owner as liquidateddamagesinthe event that the successful bidder fails to enter into a Contract andfileabondsatisfactory to the Owner assuring the faithful fulfillment of the Contract andmaintenanceof said improvements as required by the law, the provisions of this NoticeandContract Documents within (10) days after acceptance of the lowest responsive, responsiblebid.All bids shall be sealed and plainly marked. Any alteration of the Bid Form may because for rejection of the bid. State Sales Tax: This project is tax exempt. Do Not include State SalesTaxinanycalculation of Bid totals. Contractor will be provided with IAsales tax exemptionnumberfor this project. The successful Bidder will be required to furnish a Performance BondandLabor andMaterial Payment Bond in an amount equal to one hundred percent (100%) of theContract Sum, issued by a responsible Surety approved by the Owner andshall guarantee the faithful performance of the Contract and terms and conditionsthere in contained and the maintenance of said improvements pursuant to theprovisionsof theContract Document. Bid Security shall be made payable to City of Creston, Iowa, Creston , IA . Bid Security of two lowest Bidders will be retained until a contract has been awarded andexecuted, but no longer than 45 days. No Bidder may withdraw their bid within 30 daysafter opening of bids. City of Creston, Iowa , reserves the right to reject any and all bids, re-advertise for newbids, and to waive informalities that may be in the best interest of City of Creston, Iowa . Payment will be made by City of Creston, Iowa from cash-on-hand from such sources asmay be legally available. Monthly estimates will be paid to the Contractor as the work progresses in amounts equal to ninety-five percent (95%) of the Contract value of the work completed during thepreceding calendar month, including the actual cost (exclusive of overhead or profit to theContractor) of materials and equipment of a permanent nature to be incorporated in thework and delivered to and stored at the job site. Such monthly payments shall in no waybe construed as an act of acceptance for any part of the work, partially or totallycompleted. Final payment of the five percent (5%) due each Contractor will be made uponfinal acceptance of the work under the respective Contract by the Owner , and afterreceipt of satisfactory evidence that all claims pertaining to such Contract have been paidin full as provided in the Contract Document for said work. The work under the Contract shall be commenced on or before a date to be specified inthe Contract or written Notice to Proceed of the Owner, and shall achieve Substantial Completion by MM-dd-yyyy . All bids will be governed by applicable provisions in the IA Code and District Policies. The Owner reserves the right to accept or reject any or all offers. Each bidder shall visit the site to familiarize themselves with conditions under which theywill operate. All interested parties in attendance at the pre-bid meeting will sign theattendance form. There are no provisions for any additional dates for site visits.
Award
Municipal
$3,563,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2022
July 18, 2022
To Be Determined, Creston, IA
Related To This Project
Creston, IA
Bid Date: Dec 09 2021
Creston, IA
Bid Date: Aug 31 2022
Creston, IA
Bid Date: Oct 12 2023
Creston, IA
Bid Date: Apr 20 2023
Creston, IA
Bid Date: Mar 23 2023
Creston, IA
Bid Date: Apr 27 2023
Creston, IA
Bid Date: Apr 11 2023
Creston, IA
Bid Date: Apr 20 2023
Creston, IA
--
Creston, IA
Bid Date: Jul 21 2022
Creston, IA
Bid Date: May 06 2021
Creston, IA
Bid Date: Dec 09 2021
Creston, IA
Bid Date: Jul 12 2022
Creston, IA
Bid Date: Apr 20 2023
Creston, IA
Bid Date: May 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.