BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 8, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a mixed-use development in Huntington, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

The City of Huntington intends to reconstruct 1,500 linear feet of CR 200N west of SR 9, construct an auxiliary right turn lane on southbound SR 9, and construct a new 1,000 linear foot industrial park access roadway extending north from CR 200N. The scope of work for this project includes, but is not necessarily limited to, clearing right of way, removal of existing pavement and storm sewers, subgrade treatment, underdrains, asphalt pavement and subbase, concrete curb and gutter, driveway improvements, sidewalk, storm sewer construction, water main construction, and surface restoration and erosion control as specified in the Contract Documents. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over the projectshall apply to the project throughout. The City of Huntington, Indiana reserves the right to reject all bids, waive defects and amend the Project's scope. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to construct the project. The Bidder shall furnish to the Owner all such information and data for this purpose a sthe Owner may request. WORK 1.01 Contractorshall complete all Work asspecified or indicated in the Contract Documents. The Work is generally described as follows: The City of Huntington intends to reconstruct 1,500 linear feet of CR 200N west of SR 9, construct an auxiliary rightturn lane on southbound SR 9, and construct a new industrial park accessroadway extending north from CR 200N. The scope of work for this project includes, but is not necessarily limited to, clearing right of way, removal of existing pavement and storm sewers,subgrade treatment, underdrains, asphalt pavement and subbase, concrete curb and gutter, driveway improvements, sidewalk, storm sewer construction, water main construction, and surface restoration and erosion control as specified in the Contract Documents. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over the project shall apply to the project throughout. Questions received after 12 noon on Thursday, June 2, may not be addressed.

Bid Results

Roads / Highways

$1,094,761.00

Public - City

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
90
Bidding Soon
1,367
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2022

July 6, 2022

Project location map

To Be Determined, Huntington, IN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.