BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 12, 2022 at 8:00 PM

Updated September 15, 2023

Demolition, site work and new construction of an educational facility in Santa Barbara, California. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

The work of the project consists of the demolition of eight portable classrooms, the construction of two, 3-classroom buildings and associated site work. Prospective Bidders arriving after the above-designated starting time for a mandatory job walk and pre-bid conference shall be disqualified from submitting a bid for this project. The deadline for pre-bid questions or clarification requests is July 14, 2022. All questions are to be in writing and directed to the Project Architect/Engineer, Joe Wilcox, Kruger Bensen Ziemer Architects, Inc. at joew@kbzarch.com All bids shall be made on the forms provided in the specifications and each bid must conform to the Contract Documents. Each bid shall be accompanied by the bid security specified in the Instructions to Bidders. Contractor License required: B Prequalification of Bidders and E/M/P subcontractors: As a condition of bidding on this Project, and in accordance with the provisions of Public Contract Code section 20111.5 and 20111.6 all Bidders and all electrical, mechanical and plumbing subcontractors listed in the Bidder's proposal must either be prequalified for at least five business days before the date of the opening of the bids or must submit a completed prequalification package by the deadline stated below. Bids not conforming to this requirement will not be accepted. Pursuant to Public Contract Code section 20111.6(j) a list of prequalified general contractors and electrical, mechanical, and plumbing subcontractors will be made available by the District no later than July 14, 2022 at lgonzalez@sbunified.org Prequalification packages are available through the Cybercopy. Prequalification questions must be directed to L.M. Sweaney at lynns11s@aol.com or leave a voice message at (909) 337-8302. Pursuant to the provisions of Section 1773 and 1773.2 of the Labor Code of the State of California, the District has obtained from the Director of Industrial Relations, the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which the work is to be performed for each craft, classification or type of workman needed to execute the contract which is available for review online . During the Work, the Department of Industrial Relations ("DIR") will monitor compliance with prevailing wage rate requirements and enforce the Contractor's prevailing wage rate obligations, with a copy of the same being on file with the clerk of the District's governing board. It shall be mandatory upon the contractor to whom the contract is awarded, and upon any subcontractor under him, to pay not less than the said specified rates to all workmen employed by them in the execution of the contract, and to comply with all prevailing wage requirements set forth in the Labor Code. Pursuant to the provisions of Section 1771.1 of the Labor Code of the State of California, a contractor or subcontractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered and qualified to perform public work pursuant to Section 1725.5; or (2) expressly authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to section 1725.5 at the time the contract is awarded. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder will be required to post all job-site notices required by DIR regulations and other applicable law. The successful bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the General Conditions. The District will be participating in the Disabled Veteran Business Enterprises (DVBE) Participation Goal Program pursuant to Education Code section 17076.11 and Public Contract Code section 10115. No Bidder may withdraw his bid for a period of sixty (60) days after the date set for the bid opening. The District reserves the right to reject any and all bids or to waive irregularities in any bid.

Under Construction

Educational

$3,848,000.00

Public - County

Demolition, New Construction, Site Work

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Vapor Retarders, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Flush Wood Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath, Portland Cement Plastering, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Special Wall Surfacing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Other Specialties, Pest Control Devices
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Storm Drainage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Painted Pavement Markings, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Irrigation, Planting, Planting Preparation, Soil Preparation, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
59
Bidding Soon
1,002
All Active Projects
441
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2022

September 6, 2022

img_map_placeholder

123 Alameda Padre Serra, Santa Barbara, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.