Demolition, site work, remodeling and addition to a mixed-use development in Saint Clair, Minnesota. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the remodel of a educational facility; and for site work for a educational facility.

St. Clair Schools ISD #75 invites bids for the Classrooms and Multipurpose Room Additions and remodeling located in St. Clair, MN. The bids will be accordance with bidding documents prepared by MLA Architects. Bids will be received for separate prime contracts managed by R. A. Morton and Associates, LLC Construction Managers. Each bid in excess of $20,000 shall be accompanied by a bid security of 5% of the maximum amount of the bid in the form of a Surety Bond, Certified Check or Cashier's Check. Each successful prime contract bidder shall furnish a Performance and Payment Bonds in the full amount of the contract if contract exceeds $20,000. Surety must be authorized to do business in State of Minnesota. Each successful "Prime Contract" bidder shall furnish signed contract agreements, certificate of insurance, W9 form, payment and performance bonds, listing of suppliers/subcontractors and schedule of values within ten days of receipt of contract and/or upon notification acceptance of this bid. Failure to adhere to this project requirement may result in the rejection of the Contractor's bid and forfeiture of the bid bond. Prevailing wage requirements are not required. It is the intent of the Owner to take advantage of their tax-exempt status as a Minnesota Public Corporation to exclude state sales tax from material only bids and contracts. Refer to Section 002900 Work Scopes for bid division descriptions of bid packages that are material only and are not to include state sales tax. All material and labor or labor only bid packages shall include state sales tax. By their signature on the Bid, the bidder warrants and guarantees that they have included in the bid the amount of all Excise and Use Taxes which they are liable to pay under laws of the State of Minnesota for materials and equipment required to complete the Work. A bidder may withdraw the proposal at any time before the time set for opening of the bids. No bidder may withdraw a bid for a period of Forty Five (45) days after the scheduled closing time for the receiving of bids. The Owners reserves the right to accept or reject any or all bids, or parts of bids, and to waive informalities therein. For the purposes of determining the lowest responsible bidder(s) in the consideration of all bids submitted, the Owners reserves the right to accept or reject any or all alternates, in any order or combination, which appear on the Bid Proposal Form and as it may consider in the best interests of the Owners. *Addendum 1, 2 and 3 have been released. Bid Results- 1. CIP Concrete - Robert W Carlstrom Co., Inc. - $ 454,867 2. Masonry - T.C.R. Enterprises, Inc. dba J & K Masonry - $ 552,000 3. Steel Erection - A.M.E. Construction Corp - $ 63,300 4. Carpentry - Robert W Carlstrom Co., Inc. - $ 277,000 5. Roofing - Laraway Roofing, Inc. - $ 414,680 6. Doors, Frames & Hardware - Kendell Doors and Hardware, LLC - $ 142,992 7. Aluminum Doors and Windows - Hentges Glass Company - $ 198,164 8. Gypsum System- R & H Drywall, Inc - $ 68,500 9. Tilework - Grazzini Brothers & Company - $ 35,500. 10. Acoustical Ceilings - Palmer Soderberg, Inc. - $ 145,565 11. Floor Covering - MCI, Inc. dba Multiple Concepts Interiors, Inc. - $ 55,620 12. Wood Athletic Flooring - FLR Sanders, Inc. - $ 104,700 13. Painting - Admiral Coatings, Inc. - $ 81,500 14. Student Lockers - Wissota Supply Company, Inc. - $ 10,200 15. Athletic Lockers - Gear Grid - $ 76,437 16. Signage - North Star Signs & Engraving, Inc. - $ 7,600 17. Gym Equipment - H & B Specialized Products, Inc. - $ 72,600 18. Scoreboards - AIM Electronics, Inc - $ 18,368. 19. Casework - H2I Group, Inc - $ 123,215 20. Bleachers- SAAFE, LLC - $ 32,764 21. Fire Protection - Breth - Zenzen Fire Protection,LLC - $ 98,850 22. Plumbing & HVAC- Javens Mechanical Contracting Co - $ 3,873,040 23. Electrical - Laketown Electric Corporation - $ 480,052. 24. Excavation - James Bros. Construction, Inc. - $ 355,000 25. Rammed Aggregate Piles - CNC Foundations, Inc. - $ 113,970 26. Asphalt Paving - Nielsen Blacktopping, Icn. - $ 12,500 27. Chain Link Fence - Century Fence Company - $ 15,490

Bid Results

Educational

$7,884,474.00

Public - City

Addition, Demolition, Remodeling, Site Work

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
32
Bidding Soon
739
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

September 1, 2022

img_map_placeholder

To Be Determined, Saint Clair, MN


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.