BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Paramount, California. Completed plans call for site work for a road / highway.

Location- Alondra Boulevard at Passage Avenue The general items of work include removal and reconstruction of curb and gutter, sidewalk, driveway approach, curb ramps, AC pavement, PCC pavement, cold mill on existing PCC pavement, , traffic signal installation, signing and striping and all other items notmentioned but indicated in the Plans and Specifications. Any contract entered into pursuant to this Notice will incorporate the provisions of the State Labor Code. Pursuant to the provisions of Section 1773.2 of the Labor Code of the State of California, the minimum prevailing rate of per diem wages for each craft, classification, or type of workman needed to execute the contract shall be those determined by the Director of Industrial Relations of the State of California, which are on file at the City Hall, City of Paramount and are available to any interested party on request Attention is directed to the provisions of Section 1777.5 (Chapter 1411, Statutes of 1968) and 1777.6 of the Labor Code concerning the employment of apprentices by the Contractor or any such subcontractor under him. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, religion, or handicap will also be required. The AGENCY will deduct a 5-percent retention from all progress payments as specified in Section 7-3.2 of these Specifications. The Contractor may substitute an escrow holder surety of equal value to the retention. The Contractor shall be beneficial owner of the surety and shall receive any interest thereon. The AGENCY hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, religion, or handicap in any consideration leading to the award of contract In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Contractor, or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all cases of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor without further acknowledgment by the parties. Bids must be prepared on the approved proposal forms in conformance with the Instructions to Bidders and submitted in a sealed envelope plainly marked on the outside. The bid must be accompanied by a certified or cashier's check or by bidder's bond issued an "admitted surety insurer," made payable to the AGENCY for an amount not less than 10 percent of the amount bid. No bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the Business and Professions Code. The successful Contractor and his subcontractors will be required to possess business licenses from the AGENCY All bidders shall be licensed in accordance with provisions of the Business and Professions Code and shall possess a State Contractor's License, Class "A" (General Engineering), at the time of bid submittal. The successful Contractor and his subcontractors will be required to possess business licenses from the AGENCY. Notice is hereby given to Contractor that Chapter 34 of the Paramount Municipal Code dealing with false claims of contractors provides for an administrative debarment action for submitting a false claim subjecting Contractor to a potential five (5) year debarment upon finding that Contractor knowingly submitted a false claim as further set forth in Chapter 34. Failure to abide by the provisions of Chapter 34 may lead to a disqualification of the Contractor as an irresponsible bidder and resultant prohibition of Contractor, from bidding as a Contractor, Subcontractor or Consultant for a period up to five (5) years in the City of Paramount. The AGENCY reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of 60 days.

Award

Roads / Highways

$372,677.00

Public - City

Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
124
Bidding Soon
2,270
All Active Projects
1,038
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2022

July 21, 2022

img_map_placeholder

Multiple Locations, Paramount, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.