Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 19, 2025 at 8:00 PM
Updated July 20, 2025
Site work and paving for a civil project in Youngstown, Ohio. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Proposal Nm: MAH101046 County: Mahoning Four Lane Resurfacing C/R/S: MAH-IR 680-12.12 Completion Date: 7/3/2026 For Improving Various Sections in Beaver and Boardman Townships, Within Mahoning County, Ohio, in Accordance With Plans and Specifications by Planing, Performing Pavement Repairs, and Resurfacing an Approximately 4 1/2 Mile Section of I-680 From Just South of Us 224 to the Concrete Pavement North of the Toll Booth, Including All Related Items of Work. Project Includes Some Bridge Patching and Deck Sealing. OHDOT : Four Lane Resurfacing - IR 680 The surface tolerance specification requirements are modified to use the International Roughness Index (IRI) to determine both lot roughness and localized roughness for Category 1 pavements as follows: o All pavements with at least 1 centerline mile (1.6 km) of continuous paving. Short breaks in paving such as bridge decks, intersections, etc. are not considered breaks in continuous paving. o Pavement for ramps including any associated acceleration lanes or deceleration lanes; auxiliary lanes; or drop lanes, where the total combined length of any one lane is greater than 0.5 miles with a width that allows a valid profile to be collected. o Pavement for system ramps including associated acceleration lanes, deceleration lanes, and auxiliary lanes regardless of total length. "System ramp" is defined as pavement connecting two divided, limited-access highways. The surface tolerance specification requirements are modified to use the International Roughness Index (IRI) to determine localized roughness for Category 2 pavements as follows: o Roads with less than 1 centerline mile (1.6 km) of paving o Pavement for ramps plus acceleration lanes not included above. o Pavement for ramps plus deceleration lanes not included above. o Sections of undivided highways, as defined in this note, within corporation limits with posted speed limits less than 40 miles per hour, For Category 2 pavements, corrective action for all areas of localized roughness with an IRI in excess of 250 inches per mile (3.95 m/km) in 25 feet (7.6 m) is required. For these same areas, no corrective action for 0.1-mile (0.16 km) sections having an MRI (lot roughness) greater than 90 inches per mile (1.42 m/km) is required and no pay adjustments will be made for lot roughness. Do not include pavement for turn lanes including center turn lanes, shoulders, crossovers, approach slabs, and bridge decks in IRI measurements, corrective actions, and pay adjustments. Areas not part of this specification are subject to the requirements of the original item(s) specified. If the pavement surface is Rubberized Open Graded Asphalt Friction Course (Supplemental Specification 803), this specification applies to the surface of the course immediately below and references to the number of courses placed do not include the SS803 course.
Bid Results
Roads / Highways
$4,233,691.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2025
September 15, 2025
I-680, Youngstown, OH
Related To This Project
Youngstown, OH
Bid Date: Oct 07 2022
Youngstown, OH
Bid Date: Oct 11 2022
Youngstown, OH
Bid Date: Sep 07 2022
Youngstown, OH
Bid Date: Nov 02 2022
Youngstown, OH
Bid Date: Sep 29 2022
Youngstown, OH
Bid Date: Feb 22 2023
Youngstown, OH
Bid Date: Nov 16 2022
Youngstown, OH
Bid Date: Nov 30 2022
Youngstown, OH
Bid Date: Oct 13 2022
Youngstown, OH
--
Youngstown, OH
Bid Date: Oct 06 2022
Youngstown, OH
Bid Date: Oct 21 2022
Youngstown, OH
Bid Date: Nov 18 2022
Youngstown, OH
Bid Date: Nov 03 2022
Youngstown, OH
Bid Date: Oct 07 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
