Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 25, 2022 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Buckeye, Arizona. Contact the soliciting agency for additional information.
Project Name: Jackrabbit Trail T.I. Project (TRACS) Number: 010 MA 122 F0486 01L District: Central (C) Route/MP: I-10 / 122 Funding Source: F0486 01L Construction Funding FY 2025 The project is located on I-10 in the City of Buckeye. The current T.I. is to be expanded, with improvements and new access control to extend along Jackrabbit Trail approx. 1/3rd mile north and south of I-10 and will require additional R/W. The prior R/W survey for the project area was done under proj.no. 010 MA 094 H6877 01R. The initial scope tasks are anticipated to be for Verification of Right of Way Survey & Supplemental Survey. Verification of R/W Survey: The selected Consultant will verify an appropriate amount or sampling of the data shown on the Results of Survey for proj. 010 MA 094 H6877 01R and also shown on Results of Survey & Monumentation Survey for proj. 010 MA 122 H7709 01R within portions of Sec.'s 4 & 5, T1N-R2W and Sec.'s 32 & 33, T2N-R2W in order to confidently prepare a new set of R/W Plans and set monuments at all required new corner locations. Anticipated completion date of the Verification : Sep. 2, 2022. Supplemental Survey: The selected Consultant will prepare a Supplemental Survey that will cover the existing R/W (ERW) of a portion of I-10 and for Jackrabbit Trail from Fillmore St. to Encanto Blvd. The ERW of McDowell Rd will also be shown, approx. 1/4 mile east & west of Jackrabbit Trail. The Supplemental Survey will also replicate pertinent survey info. that was verified on the above said surveys. Anticipated due date of the initial review of the Supplemental Survey: Oct. 7, 2022. As the project progresses, it is anticipated that additional scope tasks that may be requested on this project will be Final R/W Plans, Initial R/W Staking and Final R/W Monumentation Survey. There will be no Pre-Submittal Meeting associated with this solicitation. Questions, in writing, shall be received by ECS at the below email address until May 27, 2022 at 2:00 P.M. (Arizona Time). No further questions shall be accepted after the time specified. The method of contractor selection has not been determined at this time. AZ DOT - RFQ On-Call - Jackrabbit Trail T.I.
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 2, 2022
I-10, Buckeye, AZ
Related To This Project
Buckeye, AZ
Bid Date: Apr 07 2022
Buckeye, AZ
Bid Date: Nov 04 2021
Buckeye, AZ
Bid Date: Apr 15 2022
Buckeye, AZ
--
Buckeye, AZ
--
Buckeye, AZ
Bid Date: Jul 07 2022
Buckeye, AZ
--
Buckeye, AZ
Bid Date: May 14 2021
Buckeye, AZ
--
Buckeye, AZ
Bid Date: May 10 2022
Buckeye, AZ
--
Buckeye, AZ
Bid Date: Dec 13 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
