Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 26, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a laboratory facility in Batavia, Illinois. Conceptual plans call for the renovation of a laboratory facility.
Fermi National Accelerator Lab (FNAL) is in the process of constructing a new accelerator, "PIP-II" [1]. This 800 foot long superconducting linear accelerator is already under construction, and will come online in 2029. PIP-II includes a dedicated cryogenic plant providing liquid and gaseous helium to components of the accelerator. The piping system which delivers the helium from the cryoplant to the accelerator is known as the Cryogenic Distribution System (CDS). This Request For Information (RFI) is intended to solicit information from potential vendors for the installation of the CDS within the PIP-II footprint. The CDS has four major components, shown in Figure 2, within the scope of this RFI: o The Distribution Valve Box (DVB) is located within the cryoplant building and serves as the interface between the cryoplant and the CDS. o The Intermediate Transferline (ITL) runs from the cryoplant building to the accelerator tunnel. This includes both a vacuum-insulated multi-circuit cold transferline and several single-wall warm piping runs. o The Tunnel Transferline (TTL) is the piping in the accelerator's underground tunnel and includes interfaces for the accelerator components. This includes a vacuum-insulated multi-circuit cold transfer line with 26 modules (25 Bayonet Cans + 1 Turnaround Can) and several single-wall warm piping runs. o The warm gas pipe headers within CDS scope, include primarily helium gas piping as well as short sections or air, water, and nitrogen piping. The final connections between the TTL and the accelerator components (known as cryomodules) are accomplished with removable U-tubes. Cryomodules and U-tubes are outside the scope of this RFI. The method of contractor selection has not been determined at this time.
Conceptual
Laboratories
$1,600,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2023
Kirk Rd & Pine St, Batavia, IL
Related To This Project
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed