Published September 22, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Addyston, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

First Street Improvements (OPWC) Completion Date: November 4 Proposals must contain the full name of the party or parties submitting the same and all persons interested therein. Each bidder is required to furnish with his proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. When the total overall project exceeds $28,789 all bidders must comply with the Prevailing Wage rates on Public Improvements in Hamilton County and the Village of Addyston, Ohio, as ascertained and determined by the Administrator of the Ohio Bureau of Employment Services (OBES) as provided in Section 4115.05 through 4115.034 of the Revised Code of the State of Ohio. It is anticipated that the Prevailing Wage Law will apply to this project. All contractors and subcontractors involved with the project will to the extent practicable use Ohio products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123 is required. Domestic Steel Use Requirements as Specified in Section 153.011 of the Revised Code Apply to This Project. Copies of Section 153.011 of the Revised Code Can Be Obtained From the Office of the Ohio Facilities Construction Commission. The Council of the Village of Addyston, Ohio, reserves the right to waive irregularities and to reject any or all bids. The Council of the Village of Addyston shall authorize acceptance of the bid made by the responsible bidder who, in Council's judgment, offers the best and most responsive proposal to the Village, considering quality, service, performance record, and price; or Council may direct the rejection of all bids. The Village may award based on "functional equivalence" concerning specified work or products. SCOPE OF WORK In general. The following are the major construction items for the First Street Stabilization project: Install approximately 210 LF of drilled shaft pier wall consisting of 30" soldier piers and 36" diameter plug piers. Mill existing pavement full width to remove deteriorated asphalt surface (3") and placement of a 1-1/2" intermediate course in the asphalt resurfacing section. Perform pavement repairs as necessary. Remove existing pavement structure and the placement of aggregate base, asphalt base, and 1-1/2" intermediate course within the roadway reconstruction section. Curb and sidewalk removal and replacement where indicated Drive apron removal and replacement where indicated New storm sewer inlet, remove and replace existing inlets and catch basin(s) as needed. Installation of guardrail where indicated. New pavement markings

Award

Roads / Highways

$243,795.00

Public - County

Paving, Site Work

5

6

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
63
Bidding Soon
1,335
All Active Projects
579
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2022

August 29, 2022

img_map_placeholder

1st St, Addyston, OH

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

First Street Improvements (OPWC)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.