BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fire / police facility in Spokane, Washington. Completed plans call for the construction of a 10,500-square-foot fire / police facility; and for site work for a fire / police facility.

Spokane Valley Fire Department (SVFD) requests qualifications from Design-Builders for the construction of a new Fire Station 11, using the procedure permitted under Chapter 39.10 of the RCW, as amended, for selected projects for public works contracting in lieu of sealed bids. The project consists of a new, 10,500 sq. ft. fire station. The project construction budget is approximately $5.0 million. Design is anticipated to begin in August 2022 and completed in January 2023. Construction is anticipated between March 2023 to December 2023. The Design-Builder shall provide high-quality services including scheduling, phasing logistics, collaboration with the design consultants, manage and estimate design budgets and design contingency solutions, direct construction best-practices, organize design investigative work and provide assistance in the selection of materials and building systems, solicit and manage subcontractor bid packages and supplier bidding.The Design-Builder shall provide high-quality construction services to safely deliver a superior project that comprises the full scope of program needs set by SVFD that is on time and within budget.The Request for Qualifications outlines the information necessary to understand this selection process and the documentation required for submitting proposals. The Project name and submittal date must appear on the outside of all submittals. Any firm failing to submit its qualifications in accordance with the procedures set forth in the Request for Qualifications may be considered non-responsive. Questions should be addressed to Jonathan Miller, OAC Services, Inc. via e-mail jmiller@oacsvcs.com. Spokane Valley Fire Department encourages the participation of Minority Owned and Women Owned Business Enterprises in this Request for Qualifications.

Post-Bid

Fire / Police

$5,500,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
8
Bidding Soon
108
All Active Projects
50
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2022

March 1, 2023

img_map_placeholder

To Be Determined, Spokane, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.