Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a playground / park / athletic field in Goose Creek, South Carolina. Completed plans call for the renovation of a playground / park / athletic field.
As of July 18, 2022, project was awarded to Satchel Construction, LLC but awarded amount is not available. The Contractor shall use materials and products in the work which are of top quality. The Contractor shall assume full responsibility for protection, storage, safety, and damage to equipment and materials until substantial completion. The Contractor shall use skilled work persons who are thoroughly trained and experienced in the necessary crafts and trades. The Contractor shall correct any and all work rejected by the City of Goose Creek as unacceptable or nonconforming to contract documents within three (3) days of notice of rejection. The Contractor shall coordinate the work and schedule the timing so as not to conflict with any City of Goose Creek Recreation activities. The Contractor shall cooperate with reasonable scheduling requirements of the City of Goose Creek. The contractor shall provide a schedule to the Recreation Department Representative (Philip Sweat). The Contractor shall provide all required safety equipment at no additional cost to the City of Goose Creek. The Contractor shall clean site of any debris which may hamper his ability to perform work as specified. The Contractor shall remove and legally dispose of all debris, unless other- wise indicated. -Re-skin/repair existing 50x80x12 metal frame building to include: o Wall panels o Roof panels o Insulation o Bringing building up to code o Replacing two roll-up style doors (1) 10x10 and (1) 12x10 o New paneling will enclose the structure to reduce wildlife entrance into structure ie along slab and wall to roof seams o Replace gutters and down spouts o Provide penetrations for existing utilities and services o Replace existing standard entry doors -Paint existing office space within metal frame building: o 3640 sqft of sheetrock walls and ceilings o 8 doors and frames o Prep o To include all trim, door frames, window frames, chair rails, and baseboards -Erect new pre-engineered steel frame structure ~30x50x10 o To match repairs to existing metal structure o Set on a monolithic slab no less than 6" reinforced concrete with machine finish o The new structure is to be placed 70' east of main structure to replace standing pole style shed o To include (2) 10x10 roll-up doors with (1) single standard entry door o Gutters and downspouts o Existing pole style shed to be removed by owner -Electrical services in new structure to be provided by others -Engineered drawings and permits and fees must be included -Any soil samples and compaction requirements pricing must be included prior to bid acceptance -There are no existing drawings or site plans We would like to start work as early as July 2022 and should be completed no later than November 2022. The contract may be canceled or any portion thereof at any time during the term of service and such cancellations shall be effective upon giving thirty (30) days written notice. Please provide your total cost for the above task as they are broken out above with each heading.
Award
Playgrounds / Parks / Athletic Fields
$200,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2022
July 1, 2022
Sandra Dr, Goose Creek, SC
Related To This Project
Goose Creek, SC
Bid Date: Aug 18 2022
Goose Creek, SC
Bid Date: Oct 10 2023
Goose Creek, SC
Bid Date: Nov 09 2023
Goose Creek, SC
Bid Date: Nov 17 2023
Goose Creek, SC
Bid Date: Jan 25 2024
Goose Creek, SC
Bid Date: Feb 20 2024
Goose Creek, SC
Bid Date: Jan 26 2022
Goose Creek, SC
--
Goose Creek, SC
Bid Date: Mar 14 2022
Goose Creek, SC
--
Goose Creek, SC
Bid Date: Feb 17 2022
Goose Creek, SC
Bid Date: Feb 22 2022
Goose Creek, SC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.