BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a sidewalk / parking lot in Mariposa, California. Completed plans call for site work for a sidewalk / parking lot.

Mariposa County is seeking qualifications from qualified planning and design teams to advance the design and permitting of the Mariposa Creek Parkway Phase III Trailhead + Destination Park. This project was identified as a priority in the Mariposa Creek Parkway Master Plan, and aligns with several current and ongoing projects in this segment of the Mariposa Creek corridor, including construction of the Phase III segment of the Parkway (funded by a grant from the Caltrans Active Transportation Program) and the riparian restoration of Phases II and III of Mariposa Creek (funded by a grant from the Wildlife Conservation Board). The project will use extensive stakeholder engagement and community outreach to revisit and confirm the outcomes of the master plan as they pertain to this specific site. Then, based on that dialogue, develop 20% design drawings for the Phase III Trailhead and Destination Park to advance the implementation of this priority project. The consultant will also develop a detailed cost estimate based on the 20% design, and use the design as the basis for securing the permits needed to implement the project when funding is available at a later time. It is assumed that work would begin in August 2022 and that project tasks will be completed in 24 months This project is funded through a grant from the Economic Development Administration's American Rescue Plan Act of 2021, which is a federal grant. Mariposa County Board of Supervisors Reject any and all proposals or waive any irregularity or information in any proposal or in the RFQ procedure The project builds on preliminary concepts developed during the Mariposa Creek Parkway Master Plan (2020), which imagines permeable parking areas providing access to existing and future trails in the creek corridor, environmental and cultural interpretive exhibits, a performance space, public art, and opportunities for visitors to access the creek and experience the local landscape. project should be completed by September 2024 The consultant budget for this project is $671,500.

Post-Bid

Sidewalks / Parking Lot

$671,500.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
28
Bidding Soon
340
All Active Projects
174
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2022

August 1, 2022

img_map_placeholder

To Be Determined, Mariposa, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.