BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Valley City, North Dakota. Completed plans call for the renovation of a educational facility.

McFarland Hall, Section A-1 (EPDM adhered roof replacement, approximately 12 SQ) Set up safety per OSHA requirements Remove existing roof system down to existing insulation Reuse existing insulation and replace wet and deteriorated insulation (provide additional cost below). Install new 1/2 " coverboard and securely fasten to decking. Install new EPDM 60 mil. adhered membrane per manufacturer's requirements. Install all associated membrane flashings per manufacturer's requirements. Fabricate and install new 24-gauge, prefinished counterflashing, cap metal, scuppers, and downspouts (standard color). Provide manufacturer's 10-year warranty. (Excludes: mechanical/electrical, snow removal, wood blocking/sheathing unless specifically provide for above, building permit). McFarland Hall, Section E (EPDM adhered roof replacement, approximately 10 SQ) Set up per OSHA requirements. Remove existing EPDM membrane and flashings. Reuse existing insulation and replace wet and deteriorated insulation (provide additional cost below). Install new 1/2 " coverboard and securely fasten to decking. Install new EPDM 60 mil. adhered membrane per manufacturer's requirements. Install all associated membrane flashings per manufacturer's requirements. Fabricate and install new 24-gauge, prefinished counterflashing, cap metal, scuppers, and downspouts(standard color). Provide manufacturer's 10-year warranty. (Excludes: mechanical/electrical, snow removal, wood blocking/sheathing unless specifically provide for above, building permit). Mythaler Hall- per annual inspection report Remove deteriorated perimeter flashings on East and West walls. Supply and install new membrane extension to go over top of wall. Replace two (2) pipe boots. Make repairs to holes in curb flashings. Reflash one (1) curb. Inspection reports available upon request. Projects to be completed prior to 9/1/2022. Contractor to work with owner to schedule around summer camps and other projects in the buildings. McFarland Hall - 101 College St SW, Valley City ND 58072 Mythaler Hall - 205 Viking Drive, Valley City ND 58072 Question Deadline: May 27, 2022

Award

Educational

$75,060.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
11
Bidding Soon
107
All Active Projects
49
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

July 4, 2022

img_map_placeholder

Multiple Locations, Valley City, ND

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.